To ensure that contractors fully understand what they will be required to do if awarded a contract, contracting officers insert language primarily into which of the following sections of the Uniform Contract Format - ACCURATE ANSWERH
The program protection plan focuses on protecting technology, ...
DAU STUDY COURSES TEST
DAU STUDY COURSES TEST WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
To ensure that contractors fully understand what they will be required to do if
awarded a contract, contracting officers insert language primarily into which of the
following sections of the Uniform Contract Format - ACCURATE
ANSWER✅✅H
The program protection plan focuses on protecting technology, whereas an OPSEC
plan focuses on protecting critical information about an organization and its
operations - ACCURATE ANSWER✅✅True
Which of the following is NOT among the five primary steps of the OPSEC
process - ACCURATE ANSWER✅✅Apply Complex Countermeasures
The responsibility to determine whether or not OPSEC requirements should be
incorporated into a correct rest primarily with which one of the following -
ACCURATE ANSWER✅✅Program manager
,Critical information typically relates to specific facts about technologies or systems
which if companies would directly affect mission accomplishment, while critical
program information deals -primarily with personnel-related datea - ACCURATE
ANSWER✅✅FALSE
Which one of the following documents requires that heads of DoD components
implement and maintain OPSEC programs - ACCURATE ANSWER✅✅5205.02
A bid is recieved in your contracting office one week prior to the bid opening date.
What is the proper procedure for handling and safeguarding the bid - ACCURATE
ANSWER✅✅Place it in a locked container with any other bids submitted in
response to in IFB
Which of the following would be considered an issue pertaining to the bidder being
non-responsive to the IFB? - ACCURATE ANSWER✅✅The IFB does not
address facsimile bids
You have a requirement for highly sensitive components that fits into a missile
launching system. The component is critical to the system in that it is required to
detonate the launcher. The current component is obsolete and is no longer
manufactured. You conduct market research and discover that there are several
manufactures that can design and manufacture the replacement. You want to see
FAR part 14 sealed bidding procedures but believe there is a need to verify the
manufacture's technical capability. what method of bidding should be used -
ACCURATE ANSWER✅✅Two-Step sealed bidding, with the opportunity of
discussion in step 1
Of the following choices, which is the most common cause for rejecting an
individual bid? - ACCURATE ANSWER✅✅The bid is non-responsive to the
IFB
, When selecting a contractor for award using sealed bidding procedures, which one
of the following statements is most accurate? - ACCURATE
ANSWER✅✅Contract award shall be made to the responsible bidder whose bid
is most advantageous to the government, considering price, past performance, and
responsibility factors
This morning at 6:00 am a severe storm struck the local area causing flood and
power outages. With this scenario what is your decision regarding receipt of this
bid? - ACCURATE ANSWER✅✅7 days
Which f the following methods can NOT be authorized for receipt of bids? -
ACCURATE ANSWER✅✅Bids received by telephone, followed by a
telegraphic message received within 7 days after bid opening
When would it be appropriate to require bid samples? - ACCURATE
ANSWER✅✅when clear description of the sample, i.e. color, pattern, or other
characteristics cannot be described adequately in the specifications or purchase
description
who normally is responsible for certifying the accuracy of the completed abstract
of offers? - ACCURATE ANSWER✅✅Bid opening officer
FAR 6.401(a) states you MAY solicit sealed bids when the four conditions listed
there in are met - ACCURATE ANSWER✅✅TRUE
Which of the following is a correct statement regarding the information that the
contracting officer shall document in the contract file - ACCURATE
ANSWER✅✅The contracting officer shall document the fire describing how a
tie was broken after receipt of equal low bids
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller GRADEUNITS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $15.49. You're not tied to anything after your purchase.