When a contractor begin work generated by a change order that does not have a full negotiated agreement on terms of work, cost, and schedule signed by both parties, a contract change has been initiated that is _______ . - ACCURATE ANSWERUndefinitized All of the five elements (5Ms) of manufacturi...

[Show more]

Preview 3 out of 20  pages

  • August 15, 2024
  • 20
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ACQ 202 [MODULE 5] PRODUCING SYSTEM
  • ACQ 202 [MODULE 5] PRODUCING SYSTEM
avatar-seller
GRADEUNITS
ACQ 202 [MODULE 5] PRODUCING
SYSTEM
ACQ 202 [MODULE 5] PRODUCING SYSTEM EXAM WITH GUARANTEED ACCURATE
ANSWERS




When a contractor begin work generated by a change order that does not have a
full negotiated agreement on terms of work, cost, and schedule signed by both
parties, a contract change has been initiated that is _______ . - ACCURATE
ANSWER✅✅Undefinitized


All of the five elements (5Ms) of manufacturing contribute o the cost of
production. Which one of the following is NOT one of the 5Ms? - ACCURATE
ANSWER✅✅Mandates.


According to learning curve theory, when the quantity of an item produced
doubles, the labor hours required to produce the item _______. - ACCURATE
ANSWER✅✅Decreased by a fixed percentage.

,The ____________ has a direct line of communication with the Procuring
Contracting Officer, and the __________ has a direct line of communication with
the Program Manager. - ACCURATE ANSWER✅✅Administrative Contracting
Officer, Program Integrator.


Personal liability for unauthorized commitments is determined by _________. -
ACCURATE ANSWER✅✅The procedures of each agency.


Design changes that are made after the beginning of production tend to be equal in
cost to changes made prior to production. - ACCURATE ANSWER✅✅False


The cost of achieving quality can be broken down into which THREE of the
following areas (Select three answers): - ACCURATE ANSWER✅✅1).
Appraisal


2). Failure


3). Prevention


In determining the correct appropriation for funding the development of a product
improvement, the first/primary consideration is: - ACCURATE
ANSWER✅✅Will it increase the performance capability?


Process proofing ensures that high risk areas, such as assembly methods and
personnel training, are optimized _______________________. - ACCURATE
ANSWER✅✅Before the start-up of full rate production


Which of the following can negatively impact the learning curve, production costs,
and schedule? - ACCURATE ANSWER✅✅Inconsistent product design.

, Manpower, measurement, methods, machinery, and materials are collectively
referred to as the ___________________. - ACCURATE ANSWER✅✅5Ms of
Manufacturing.


Which process is recommended for those products with the highest volume and the
highest standardization on the product continuum? - ACCURATE
ANSWER✅✅Continuous flow.


Lean manufacturing tends to increase manufacturing costs and delay schedules in
the manufacturing process. - ACCURATE ANSWER✅✅False.


Which process is recommended for those products with the lowest volume and the
lowest standardization on the product continuum? - ACCURATE
ANSWER✅✅Jumbled flow


Which of the following is NOT lawful authority and can be a cause of
unauthorized commitments? - ACCURATE ANSWER✅✅Apparent Authority


As production of an item increases, what impact does that typically have on the
unit cost? - ACCURATE ANSWER✅✅Unit cost decreases


What is the typical impact on a program's cost and schedule when unstable
requirements lead to changes late in the system's development? - ACCURATE
ANSWER✅✅Significantly negative impact on cost and schedule.


In determining the correct appropriation for funding the development of a product
Improvement, the first/primary consideration is: - ACCURATE
ANSWER✅✅Will it increase the performance capability?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller GRADEUNITS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78462 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.49
  • (0)
  Add to cart