The contractor is required to replace the lighting fixtures wiht the fixtures specified without remibursement - Answer A contractor under a fixed-price construction contract has allowed the electrical subcontractor to install lighting fixtures other than those stated in the contract documents. T...

[Show more]

Preview 2 out of 14  pages

  • August 17, 2024
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCARB
  • NCARB
avatar-seller
Examsplug
NCARB practice Study Questions with
Answers
The contractor is required to replace the lighting fixtures wiht the fixtures specified
without remibursement - Answer A contractor under a fixed-price construction contract
has allowed the electrical subcontractor to install lighting fixtures other than those
stated in the contract documents. The electrical subcontractor and the contractor both
believe the substituted fixtures to be of equal value. The construction is substantially
completed and the architect rejects these fixtures. According to AIA Document A201,
General Conditions, which of the following actions must be taken regarding the lighting
fixtures?


A. The architect must accept the lighting fixtures as installed without a cost credit to the
owner.
B. The architect must accept the lighting fixtures as installed but with a cost credit to the
owner.
C. The contractor is required to replace the lighting fixtures with the fixtures specified
without reimbursement.
D. The contractor is required to replace the lighting fixtures specified but is entitled to
reimbursement for labor costs for the replacement.


the bidding climate - Answer Architect estimates of construction cost based on final
documents should consider which of the following?


A. known changes order sums
B. the bidding climate
C. the amount of monthly certificate of payment
D. the amount of retainage

, clarify responsibilities and operation procedures - Answer Which of the following
agenda items should be discussed at a pre-construction conference?


A. review bonds and affidavits
B. Determine whether a performance bond and a payment bond are required
C. Discuss changes to completed work
D. Clarify responsibilities and operating procedures


the contractor - Answer Shop drawings for dormitory windows have been prepared by
the manufacturer, checked by the local distributor, and reviewed and approved by the
contractor and the architect. During installation, it is discovered that the quantity of
windows as indicated on the shop drawings is one less than that shown in the contract
documents. Who is responsible for the discrepancy?


A. the architect
B. the manufacturer
C. the distributor
D. the contractor


A, B, D - Answer On-site field observations by the architect are made to determine
which of the following? Check the three that apply


A. the progress and quality of the work
B. the amount of work completed for progress payment
C. the techniques of the construction being utilized
D. whether the work is being performed according to the contract documents
E. whether the contractor is following the proper sequence of installation
F. whether the contractor is following proper safety procedures

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Examsplug. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart