100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
SWPPP Test exam with correct answers 2024 $10.99   Add to cart

Exam (elaborations)

SWPPP Test exam with correct answers 2024

 5 views  0 purchase
  • Course
  • SWPPP T
  • Institution
  • SWPPP T

The law that set into place stormwater regulations in the 1970s is correct answers The Clean Water Act Regulations for managing stormwater activity on a construction site are outlined in the correct answers NPDES When should you read and understand your project stormwater pollution preventi...

[Show more]

Preview 2 out of 5  pages

  • August 21, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • SWPPP T
  • SWPPP T
avatar-seller
HopeJewels
SWPPP Test

The law that set into place stormwater regulations in the 1970s is correct answers The
Clean Water Act

Regulations for managing stormwater activity on a construction site are outlined in the
correct answers NPDES

When should you read and understand your project stormwater pollution prevention
plan correct answers Immediately after the project awarded and before you begin any
site work is

Which of the following is not an allowable stormwater discharge or non-stormwater
discharge correct answers Discharges are contaminated groundwater

Construction activity may begin correct answers When the jurisdiction of operation
specifies you can start

Waters that sell anti-degration standards are placed on the _______ list correct
answers 303D

SWPP certifications are signed by correct answers An officer of the project owner or an
officer of the general contractor.

TRUE OR FALSE: The document that must be completed signed and submitted to the
state to obtain authorization to discharge is the NOT correct answers False

The notice of termination can be filed when correct answers All construction inside and
outside of the building is completed and the final stabilization has been verified as
complete

Operators on a construction site are the entity in charge of plans and specifications and
the entity who is correct answers Is in charge of daily activities

You should have a SWPPP for your construction site because (3 reasons) correct
answers 1. Its documents stormwater management
2. Demonstrates your intent to manage stormwater on your site
3. It is required by law

A well constructed SWPPP for your site should be correct answers Site specific

The NO must be submitted correct answers Prior to you commencing construction

, One necessary component of a good SWPPP is correct answers A schedule of
activities

Factors that may impact the SWPPP scheduling activities include correct answers
Weather and climate

Pollutant sources on a construction site may include (3) correct answers 1. petroleum
storage tanks
2. Masonry material
3. soil amendment

The following considerations may be incorporatedd into SWPPP correct answers
Endangered species and historical preservation

If you beileve BMP modifications are necessary onsite you must, correct answers Seek
written approval of the project SWPPP designer and project owner

The SWPPP will contain the following (3) correct answers 1. Erosion and sediment
control bet management practices
2. A site specific sequence of construction activiites
3. site maps

Once a site has experienced a rain event of measurable quantity you must identify
correct answers Deficit and fialed BMP's and repair

The document that contains the permit number is correct answers The permit
authorization letter

The portion of the the SWPPP that specifies the content of the SWPPP is correct
answers The table of contents

The document in the SWPPP that certifies the GC's commitment to compliance with the
SWPPP correct answers The SWPPP certification letter

The certifactions letter that identifies the name and contact information of
subcontractors on the site is correct answers The subcontractors certification form

The documents that reveal the total area of disturbance are correct answers The site
maps

The document completed by the project SWPPP inspector recording site conditions
during the inspection is correct answers The inspection report form

The document that must be completed to report hazardous spill on site is correct
answers The spill report form

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller HopeJewels. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82185 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart