Class A/B Operator for Underground Storage Tank Exam Questions and Answers A+graded….
1 view 0 purchase
Course
Class A/B Operator for Underground Storage Tank
Institution
Class A/B Operator For Underground Storage Tank
Class A/B Operator for Underground Storage Tank
Exam Questions and Answers A+graded….
The Class A and Class B certification must be renewed every: - CORRECT
ANSWER--5 years
UST financial responsibility requirements apply to what? - CORRECT ANSWER--
600 gallon used oil tank
Secondary Conta...
Class A/B Operator for Underground Storage Tank
Exam Questions and Answers A+graded….
The Class A and Class B certification must be renewed every: - CORRECT
ANSWER--5 years
UST financial responsibility requirements apply to what? - CORRECT ANSWER--
600 gallon used oil tank
Secondary Containment is required for what? - CORRECT ANSWER--New UST
Systems, Piping in contact with the ground, and Replacement UST
A Class A operator shall maintain the records of UST site inspections for a
*minimum* of: - CORRECT ANSWER--3 years
New owners of an existing UST system shall register the UST system with
DEQ/LARA within what period from date of ownership? - CORRECT ANSWER--30
days
UST systems with cathodic protection should be inspected for proper operation by a
qualified cathodic protection tester on the following schedule: - CORRECT
ANSWER--Every three years
UST systems with impressed current cathodic protection systems must be inspected
at a minimum: - CORRECT ANSWER--Every 60 days
Within what period after a repair should a cathodically protected UST system be
tested to ensure it is working properly? - CORRECT ANSWER--6 months
Pressurized underground piping that routinely contains regulated substances shall
be monitored for releases in a manner that meets what requirements? - CORRECT
ANSWER--Be equipped with a line leak detector, and have an annual line tightness
test
A suspected release must be confirmed to the DEQ/LARA within: - CORRECT
ANSWER--7 days
What actions are required in MUSTR when there is a spill or overfil of petroleum or
hazardouz substances that result in a release into groundwater, surface water, or
substance soils? - CORRECT ANSWER--Notify DEQ/LARA of a confirmed release,
Immediately clean up the spill or overfill, and Contain the spill
To permanently close a tank, an owner and operator shall: - CORRECT ANSWER--
Remove the tank from the ground, Fill with an inert solid if removal jeopardizes the
building structure integrity, and Empty and clean the tank by removing all liquids and
accumulated sludge and purge it of all vapors
If you have 100 or fewer tanks, financial responsibility is required in the aggregate
the amount of: - CORRECT ANSWER--$1 Million
, Petroleum marketers are required to have finanical responsibility to cover X dollars
per occurence. X is.... - CORRECT ANSWER--$1 Million
Can an owner use pollution liability insurance as a means of financial responsibility?
- CORRECT ANSWER--Yes
An automatic tank gauge must be able to detect a leak of X gallons per hour. X is: -
CORRECT ANSWER--0.2 gallons per hour
Statistical Inventory reconciliation (SIR) analyzes the following as a means of leak
detection: - CORRECT ANSWER--Inventory, Delivery and Dispensing
Manual tank gauging can be used as the 'sole' means of a leak detection for tanks
that are X gallons or less in capacity. X is: - CORRECT ANSWER--550 gallons
Check if the following statement is true or false: "A third party evaluation of a
statistical inventory reconciliation is good for any type of tank and product." -
CORRECT ANSWER--False
Automatic line leak detectors must be able to detect a leak of at least X gallons per
hour at a line pressure of 10 psi witin one hour. X is: - CORRECT ANSWER--3
gallons per hour
Line testing of piping shall be capable of detecting X gallons per hour leak rate at 1
and a half times the operating pressure. X is: - CORRECT ANSWER--0.1 gallons per
hour
What actions are not appropriate when when the owner/operator becomes aware of
a spill or overfill? - CORRECT ANSWER--Drain the spill to the storm sewer or
nearby ditch
Upon confirmation of a release to the soil/groundwater/surface water the operator
shall: - CORRECT ANSWER--Report the release to the DEQ within 24 hours, by fax
or phone
A Class B operator shall not be responsible for more than the following facilities: -
CORRECT ANSWER--45 facilities
What is the minimum frequency of site inspections to assure operational
compliance? - CORRECT ANSWER--Quarterly
If a facility has been determined by the DEQ inspector to be out of compliance with
the significant operational compliance requirements, the DEQ shall retrain: -
CORRECT ANSWER--The class A operator of the facility
When planning to permanently close a UST system, the DEQ must be notified not
less than: - CORRECT ANSWER--30 days
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller reagandave. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $8.49. You're not tied to anything after your purchase.