100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
COSC 275 Final Exam Palmer | Questions And Answers Latest {} A+ Graded | 100% Verified $12.48   Add to cart

Exam (elaborations)

COSC 275 Final Exam Palmer | Questions And Answers Latest {} A+ Graded | 100% Verified

 9 views  0 purchase
  • Course
  • Top Academic Resources 2024/2025
  • Institution
  • Top Academic Resources 2024/2025

COSC 275 Final Exam Palmer | Questions And Answers Latest {} A+ Graded | 100% Verified

Preview 2 out of 10  pages

  • August 22, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Top Academic Resources 2024/2025
  • Top Academic Resources 2024/2025
avatar-seller
oneclass
COSC 275 Final Exam Palmer | Questions And Answers Latest {2024- 2025} A+ Graded |
100% Verified


Estimating - The process of determining the anticipated cost of materials, labor, and equipment of a
proposed project.



Take-off - The process in which detailed lists are compiled, based on drawings and specifications, of all
the material and equipment necessary to construct a project. The cost estimator uses this list to
calculate how much it will cost to build the project.



Quantities - Measured amounts of construction items expressed in their customary units.



Quantification - In estimating an activity to translate project scope information into resource quantities
suitable for



Quantity survey - A detailed analysis of material and equipment required to construct a project.



Area - A measurement of a given planar region or of the surface of a solid.



Area method - A construction cost estimating system employing unit square foot costs multiplied by the
adjusted gross floor area of a building.



Length - The longest dimension of an object.



Linear measurement - A unit or system of units for measuring length: 12" = 1', 3' = 1
yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.



Dimension - A distance between two points, lines, or planes.



Specifications - Documents that define the qualitative requirements for products, materials, and
workmanship upon which the contract for construction is based.

, Drawings - Graphic illustrations depicting the dimensions, design, and location of a project. Generally
including plans, elevations, details, diagrams, schedules, and sections.



Addendum - A document describing an addition, change, correction, or modification to contract
documents. An addendum is issued by the design professional during the bidding period or prior to the
award of contract, and is the primary method of informing bidders of modifications to the work during
the bidding process. Addenda become part of the contract documents.



Amendment - A modification of the contract by a subsequent agreement. This does not change the
entire existing contract but does alter the terms of the affected provisions or requirements.



Grade - The surface or level of the ground.



Level - A term used to describe any horizontal surface that has all points at the same elevation and thus
does not tilt or slope.



Site - The location of a project geographically, usually defined by legal boundaries.



Elevation - A vertical distance relative to a reference point.



Cut and fill - An operation commonly used in road building and other rock and earth-moving operations
in which the material excavated and removed from one location is used as fill material at another
location.



Fill - The soil or other material used to raise the grade of a site area.



Foundation - The entire masonry substructure below the first floor or frame of a building, including the
footing upon which the building rests.



Grade beam - A horizontal end-supported (as opposed to ground-supported) load-bearing foundation
member that supports an exterior wall of a superstructure.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller oneclass. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.48. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.48
  • (0)
  Add to cart