100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CQM 6.1 PRACTICE QUESTIONS WITH SOLUTIONS $13.49   Add to cart

Exam (elaborations)

CQM 6.1 PRACTICE QUESTIONS WITH SOLUTIONS

 4 views  0 purchase
  • Course
  • CQM
  • Institution
  • CQM

Exam of 1 pages for the course CQM at CQM (CQM 6.1)

Preview 1 out of 1  pages

  • August 23, 2024
  • 1
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CQM
  • CQM
avatar-seller
julianah420
CQM 6.1

Quality Assurance - answer The primary function of quality assurance is to obtain
completed construction that meets all contract requirements. Assurance is defined as a
degree of certainty. Quality assurance personnel continually assure--or make certain--
that the contractor's work complies with contract requirements.

The role of quality assurance personnel - answer to assure that the CQC system is
functioning properly by:
• Examine the quality control methods being used to determine if the
contractor is properly controlling design activities in design-build contracts.
• Examine the quality control methods being used to determine if the
contractor is properly controlling construction activities.
• Make certain that the necessary changes are made in the contractor's QC
system, if excessive construction deficiencies occur.
• Assist the contractor in understanding and implementing the contract
requirements.
• Examine ongoing and completed work.
• Review QC documentation to assure adequacy

The primary function of CQC - answer successful execution of a realistic plan to ensure
that the required standards of quality construction will be met.

CQC contractor (QC personnel) responsibilities - answer• Produce the quality specified
in the plans and specifications, and for
design-build contracts in the Request for Proposal, as well as the
contractor's accepted proposal.
• Develop and maintain an effective CQC system.
• Perform all control activities and tests.
• Prepare acceptable documentation of CQC activities.

For design-build contracts what additional requirements must be included
in the QC plan - answerdesign quality
and the performance of constructability, operability, environmental and
sustainable review of the design.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76462 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart