If manufacturer training is no longer available, may a local agency help?
Approve similar alternate training.
UST includes?
,Tank and attached piping.
What constitutes a UST?
A petroleum storage tank.
What UST system is suitable for secondary containment?
Double-walled tanks
According to title 23, the following plumbing components, if installed after July 1,
1987, require supplementary containment.
Pressured product piping.
Tanks constructed after July 1, 2003, are considered "pipe".
Product piping under pressure, as well as vapour recovery underground.
Under dispenser containment (UDC) was necessary for all existing UST systems.
December 31, 2003.
A system for exchanging gas vapors in a storage tank with product in a gasoline
delivery vehicle
Stage 1 Vapor Recovery
An approved approach for non-visual monitoring of existing UST systems.
Statistical Inventory Reconciliation (SIR).
,ATG must be able to detect the emission of?
0.2 gallons per hour.
What is no longer an acceptable way for non-visual monitoring of existing UST
systems?
Manual inventory reconciliation.
Automatic line leak detectors installed on subterranean plumbing with secondary
containment must be capable of detecting leaks of?
3 gallons per hour at 10 psi.
How frequently should ATG be programmed to test the tank?
At least monthly.
According to PEI RP 300, a flammable gas can be used.
Identify vapour leaks in a vapour recovery system.
According to PEI RP 300, what should a written scope of work for vapour recovery
installation include?
Construction blueprints.
When the tank is empty, does the positive shut-off overfill protection device stop
the flow of fuel?
95% full
, According to Executive Order (EO) VR 201-A, what may cause a nozzle shut off
mechanism or malfunction?
Depended filter seal deterioration.
According to VR 201-A, breakaway reconnection should be?
Logged in GDF log.
According to PEI RP 300, what is an incorrect technique of documenting piping
location?
Drawing a diagram on the inside cover of the vapor recovery device manual.
According to PEI RP 300, as-built drawings or photos of subterranean piping and
other components must be_________.
maintained as long as UST is operational.
According to EO VR 101-E, maintenance records must cover what?
Name and Designated UST Operator.
The Phil-Tite EVR Phase 1 system requires that vapor vent pipes in any UST
system be
Used with no more than three p/v valves.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller luzlinkuz. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.99. You're not tied to anything after your purchase.