100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Cpsi exam 2024 with actual correct questions and verified detailed answers by experts frequently tested questions and solutions already graded a+newest guaranteed paslatest update $7.99   Add to cart

Exam (elaborations)

Cpsi exam 2024 with actual correct questions and verified detailed answers by experts frequently tested questions and solutions already graded a+newest guaranteed paslatest update

 2 views  0 purchase
  • Course
  • CPSI - Certified Playground Safety Inspector
  • Institution
  • CPSI - Certified Playground Safety Inspector

Cpsi exam 2024 with actual correct questions and verified detailed answers by experts frequently tested questions and solutions already graded a+newest guaranteed paslatest update

Preview 2 out of 5  pages

  • August 26, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CPSI - Certified Playground Safety Inspector
  • CPSI - Certified Playground Safety Inspector
avatar-seller
KINGNOTES1
Certified Playground Safety Inspector CPSI Sample Exam Questions

1. To be compliant with ASTM 1487, a designer or manufacturer of playground
equipment should: provide buyers with a parts list for the playground
2. 2. The fish or wedge probe is used to determine whether or not a hazard
exists on: a partially bounded opening
3. 3. Which of the following is correct regarding the impact-attenuation of
surfacing material: Critical height must equal or exceed fall height
4. 4. When evaluating the structural integrity of a support structure for a swing
that appears to be failing, a CPSI should: hire a licensed professional engineer
to certify the integrity of the equipment
5. 5. Manufacturers of playground equipment must: provide the
manufacturer's identification of the equipment:
6. 6. The majority of injuries associated with playground equipment result
from: falls to the surface on which the equipment was located
7. 7. An opening may present a common crush or shear hazard only if it: grabs
the 5/8" (16mm) dowel
8. 8. The criteria for unitary surface materials includes meeting requirements
of: ASTM F1292 and F1487
9. 9. Regarding playground safety signage, which of the following is correct:
-
Signage may not prevent accidents but may reduce liability
10. 10. Which of the following factors is MOST important when determining
the frequency of inspections of surfacing: Type of surfacing and amount of
use
11. 11. When planning a playground for public use, the play equipment that
is chosen must: be appropriate for the age of intended users
12. 12. A spring rocker with seat height of 26" is about to be installed
adjacent to the side of a fully enclosed bucket swing set. The minimum
distance required between the swing set and the rocker is: 108" or 9'
13. 13. The Site History File for a playground should contains: a
comprehensive inventory of all equipment, a parts list, maintenance, and
inspection recommendations
14. 14. What is the minimum use zone between a stand-alone climber and a
standing-rocking/springing playground piece: 156" or 13'
15. 15. The _____ of each play structure shall provide clear and concise
inspection instructions: Manufacturer
16. 16. Heights of guardrails and protective barriers are determined by which
of the following characteristics of children: Center of gravity

1/5

, .

17. 17. Which of the following is allowed on a public playground: Swinging
exercise rings less than 7" in length are approved for public playgrounds
18 18. A component on stationary equipment that fits within a projection
gauge and extends beyond the face of the gauge is technically defined as
a: protrusion
19. 19. According to the CPSC, which of the following statements is correct:
The use zone is the area under and around the equipment where protective
surfacing is required
20. 20. According to CPSC, good playground supervisors must understand
all
EXCEPT: general playground design
21. 21. Where is the best source for accessible design information: DOJ 2010
ADA Standard for Accessible Design
22. 22. How should the CPSI determine the impact attenuation of the poured-
in-place safety surfacing when auditing a playground: Verify the
documentation from the manufacturer
23. 23. In the case that a CPSI will be training co-workers. The initial goal of
the staff training should be to: ensure awareness of playground safety
24. 24. What is the most serious type of injury that can occur from a play
component projection: entanglement
25. 25. Which of the following covers selecting and specifying surface
systems under and around playground equipment: ASTM F2223
26. 26. It is the responsibility of the ______ to replace signs or labels or both,
should they become illegible, destroyed, or removed: Owner/Operator
27. 27. Upon doing a routing inspection, a maintenance worker finds a badly
cracked child's swing seat. There is no other seat available. The
maintenance worker should: remove the swing seat and chains
28. 28. The ADA requires that accessible equipment on new or renovated
playgrounds must: be on an accessible route
29. 29. Which of the following is exempt from the head entrapment
requirements: The opening between the surface and the first rung
30. 30. When evaluating a site for it's potential as an appropriate site for future
playground, all of the following should be considered EXCEPT: proximity
to the closest existing public playground with similar design
31. 31. Which areas on a playground using loose fill surfacing are more
susceptible to displacement: Under swings and slide exits


2/5

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller KINGNOTES1. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73243 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart