The Goal By Eliyahu Goldratt Max UPDATED Exam Questions and CORRECT Answers main character - Correct Answer- alex rogo company - Correct Answer- unico problem - Correct Answer- everything is late, working on overtime,not making money Peach - Correct Answer- division vice president alex's jo...

[Show more]

Preview 4 out of 59  pages

  • August 28, 2024
  • 59
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • The Goal By Eliyahu Goldratt
  • The Goal By Eliyahu Goldratt
avatar-seller
MGRADES
The Goal By Eliyahu Goldratt Max
UPDATED Exam Questions and
CORRECT Answers

main character - Correct Answer- alex rogo


company - Correct Answer- unico


problem - Correct Answer- everything is late, working on overtime,not making money


Peach - Correct Answer- division vice president


alex's job - Correct Answer- plant manager


how long does the division have to improve - Correct Answer- 1 year


how long does the plant have to improve - Correct Answer- 3 months


Jonah - Correct Answer- old physics professor, consultant


what does jonah tell alex during the first meeting at the airport - Correct Answer- -productiviy
is meaningless unless you know a goal
-preducts the high inventories and late orders
-tell alex to not think like everyone else


what does alex decide the goal is? - Correct Answer- TO MAKE MONEY----not to fill
warehouses full of inventory


what is the absolute measurement ? relative measurement? - Correct Answer- net profit needs
to increase (absolute) along with increasing ROI...return on investment... and cash flow
(relative)

,throughput - Correct Answer- the rate at which the system generates money through
SALES...money coming in


inventory - Correct Answer- the money that the system has invested in purchasing things
which it intends to sell


operational expense - Correct Answer- all the money the system spends in order to turn
inventory into throughput


Stacey - Correct Answer- inventory control women


Bob - Correct Answer- production manager


Lou - Correct Answer- accounting


robots - Correct Answer- the robots actually increased costs and didn't decrease any costs


statistical fluctuations - Correct Answer- types of information that vary from one instance to
the next


dependent events - Correct Answer- events that depend on something else happening before
they can happen


in an efficient plant should everyone be working all the time? - Correct Answer- no


what is a balanced plant - Correct Answer- when the capacity of each and every resource is
balanced exactly with demand from the market


Herbie - Correct Answer- -slow kid on the boy scout camping trip that kept messing up the
flow of the marching line
-he helped alex understand dependent events and statistical fluctuations

,how does alex decide that a balanced plant is not the answer? - Correct Answer- dice game/
match bowl experiment....showed that because of statistical fluctuations and dependent events
throughput goes down and inventory goes up


how does alex fix the herbie problem on the hike? - Correct Answer- he put him at the front
of the line and relieved him of his pack...this valences fluctuations and increased his
productivity which increased throughput of the team


bottleneck - Correct Answer- any resource whose capacity is equal to or less than the demand
placed on it


nonbottleneck - Correct Answer- any resource whose capacity is greater than the demand
placed on it


should the resources at the beginning have more capacity or should the resources at the end? -
Correct Answer- the ones at the end should have more capacity


what should you balance with demand - Correct Answer- the flow of product through the
plant


why does every plant need bottlenecks? - Correct Answer- if they didn't they would have
enormous excess capactiy


how do they increase the capacity of the plant - Correct Answer- they need more capacity at
the bottlenecks


how do they make the bottle necks more efficent - Correct Answer- -make them run
continuously
-put quality control before the bottle necks so that the bottle necks are only working on
quality products
-they relieved workload on the bottle necks by giving some work to vendors


how much does it cost when a bottle neck is down - Correct Answer- 2735= the cost of the
entire system
-because without the parts from the bottlenecks you can't sell the products

, does alex use FIFO or LIFO - Correct Answer- FIFO--first in first out...most overdue orders
first


what was the tag system - Correct Answer- a way to communicate to the workers which
parts/orders were important


green tags - Correct Answer- non bottleneck material, second priority (always work on batch
with lower number)


red tag - Correct Answer- first priority, materials processed by bottle neck, work on them
right away (only allowed to finish another order if it takes less than 1/2 and hour) ((always
work on batch with lowest number))


what is another thing that helped with the bottle necks - Correct Answer- they found
complement machines


why are workers not at the bottlenecks when batches need to be changed - Correct Answer-
they are under the impression that they have to be constantly working, so they don't want to
just wait on batches to be done


what does the night foreman make a difference on the bottleneck - Correct Answer- he finds a
process by mixing and matching order priority that increases efficiency by 10 percent


what happened when they new priority system starts working? - Correct Answer- inventory
decreases and it revealed more "bottlenecks"


what is the problem with working non-bottlenecks to capacity on bottleneck parts (red) -
Correct Answer- because now there are stacks of bottleneck parts that need non bottleneck
parts for final assembly...the red and green tags need to be modified


what does alex decide he needs to fix the problem with non bottlenecks and bottleneck -
Correct Answer- a signal to link the bottlenecks with the release-of-materials schedule

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller MGRADES. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83637 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart