100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
4th Class Power Engineering Part B Unit 4 - Boiler Plant Operation $10.99   Add to cart

Exam (elaborations)

4th Class Power Engineering Part B Unit 4 - Boiler Plant Operation

 3 views  0 purchase
  • Course
  • Power Engineering
  • Institution
  • Power Engineering

4th Class Power Engineering Part B Unit 4 - Boiler Plant Operation What is a step that would NOT be done prior to lighting off a boiler - ANS Open the blow-off valve A process done to a boiler in order to remove any grease or oil from the heating surface when the boiler is brand new - ANS ...

[Show more]

Preview 2 out of 9  pages

  • August 29, 2024
  • 9
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Power Engineering
  • Power Engineering
avatar-seller
JPNAOMISTUVIA
4th Class Power Engineering Part B Unit 4
- Boiler Plant Operation
What is a step that would NOT be done prior to lighting off a boiler - ANS Open the
blow-off valve

A process done to a boiler in order to remove any grease or oil from the heating surface
when the boiler is brand new - ANS Boiler Boil Out




A
Most important pre-start up check for a boiler - ANS Water Level




VI
While a boiler is warming up, it is good practice to - ANS Ensure proper operation of
the low water fuel cut-off




TU
If a new boiler is not properly boiled out, it may result in a - ANS Foaming condition
occurring
IS
A process done to a boiler in order to dry out new refractory - ANS Boiler dry-out

Before starting up a new boiler or one that has been out of service the following must be
OM

ensured - ANS The boiler has a valid inspection certificate

During start up of a boiler, the vent on the steam drum is - ANS Opened to allow the
escape of non-condensable air
NA


Before starting boiler draft fan(s), the operator should ensure that they - ANS Check
for adequate lubrication in the bearings

New refractory must be thoroughly and properly cured with a light fire because - ANS
JP




It contains moisture that can cause it to fracture if not cured

Boiler boiling out procedure should be done with an - ANS Alkaline solution

Before filling a boiler with water, the engineer should ensure that - ANS Blow off
valves are closed, Drum vent is open

A gradual increase in stack temperature, after warm up, is an indication of - ANS
Unclean heating surfaces

, According to the recommended rules for operation of hot water heating boilers, when
cutting in an additional boiler into the heating system the __________until the boiler is
warmed up - ANS Stop valves in the supply and return lines are both closed

It is vitally important to slowly heat up a cold boiler to prevent - ANS Uneven
expansion

Slight smoking during the start-up of a cold oil-fired boiler is caused by - ANS Oil and
furnace temperatures not yet up to operational parameters




A
Upon starting, a cold gas-fired boiler water initially may leak from the reversing




VI
chambers due to - ANS Combustion gases are condensing on cold boiler surfaces

According to the recommended rules for operation of hot water heating boilers, when




TU
cutting in an additional boiler into the heating system once the boiler reaches operating
temperature - ANS Supply and return line valves are both open slowly

A power boiler main steam outlet valve is usually called the - ANS Non-return valve
IS
If three boilers each have a pressure of 130 kPa, the pressure in the steam header will
be - ANS 130 kPa
OM

The boiler is filled with water and before you can light up the furnace, what must you do
first? - ANS Purge the furnace thoroughly

The drain on the non-return valve is actually connected - ANS Internally to the
NA


downstream side of the valve plug

The piping between the boiler non-return valve and the steam header valve is called the
- ANS Boiler steam line
JP




The point that a pressurized steam boiler begins to deliver steam to a header that is
being supplied by other boilers is referred to as - ANS Cutting the boiler into the
header

The purpose of a "double block and bleed" gas valve arrangement is to - ANS Prevent
gas from entering the furnace when the boiler is down

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller JPNAOMISTUVIA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

73091 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart