Exam (elaborations)
NICET Level 2 Full Exam questions with correct answers
Course
NICET 1 highway construction
Institution
NICET 1 Highway Construction
NICET Level 2 Full Exam questions with correct answers
[Show more]
Preview 4 out of 58 pages
Uploaded on
August 31, 2024
Number of pages
58
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
Institution
NICET 1 highway construction
Course
NICET 1 highway construction
$13.49
Also available in package deal from $40.46
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
Also available in package deal (1)
1. Exam (elaborations) - Nicet level 2- field formulas
2. Exam (elaborations) - Nicet level iii questions with answers
3. Exam (elaborations) - Nicet exam questions with answers
4. Exam (elaborations) - Nicet study guide unit 1 – 32 questions with answers
5. Exam (elaborations) - Nicet concrete level 1 questions with correct answers.
6. Exam (elaborations) - Nicet level 2 full exam questions with correct answers
7. Exam (elaborations) - Nicet level 1 questions with answers
8. Exam (elaborations) - Nicet level 2- concrete structure construction and drainage questions and answers.
Show more
NICET Level 2 Full Exam questions with
correct answers
You |are |inspecting |a |construction |site |and |notice |that |the |soil |appears |to |be |a |fine-grained, |
cohesive |material |with |good |bearing |capacity. |What |type |of |soil |is |this |likely |to |be?
a. |Clay |
b. |Sand |
c. |Gravel |
d. |Loam |- |ANSWERS✔✔a. |Clay
You |are |inspecting |the |clearing |and |grubbing |of |a |construction |site |and |notice |that |a |large |tree
|has |been |removed |within |the |limits |of |disturbance. |What |should |you |do?
a. |Notify |the |project |manager |and |request |that |a |replacement |tree |be |planted |
b. |Document |the |removal |in |the |construction |logs |and |move |on |
c. |Issue |a |stop |work |order |until |a |replacement |tree |can |be |planted |
d. |Request |that |the |tree |be |replaced, |but |do |not |issue |a |stop |work |order |- |ANSWERS✔✔d. |
Request |that |the |tree |be |replaced, |but |do |not |issue |a |stop |work |order
You |are |inspecting |the |placement |of |an |embankment |and |notice |that |the |compaction |is |below
|the |required |specification. |What |should |you |do?
a. |Accept |the |work |and |move |on |
b. |Notify |the |project |manager |and |request |that |the |compaction |be |corrected |
c. |Issue |a |stop |work |order |until |the |compaction |can |be |corrected |
d. |Document |the |issue |in |the |construction |logs |and |move |on |- |ANSWERS✔✔b. |Notify |the |
project |manager |and |request |that |the |compaction |be |corrected
,You |are |asked |to |calculate |the |excavation |and |embankment |quantities |for |a |construction |
project. |What |information |do |you |need |to |complete |this |task?
a. |The |dimensions |of |the |excavation |and |embankment |areas |
b. |The |weight |of |the |soil |and |other |materials |
c. |The |density |of |the |soil |and |other |materials |
d. |All |of |the |above |- |ANSWERS✔✔d. |All |of |the |above
You |are |inspecting |a |construction |site |and |notice |that |temporary |erosion |and |sediment |
controls |are |not |properly |installed. |What |should |you |do?
a. |Accept |the |work |and |move |on |
b. |Notify |the |project |manager |and |request |that |the |controls |be |corrected |
c. |Issue |a |stop |work |order |until |the |controls |can |be |corrected |
d. |Document |the |issue |in |the |construction |logs |and |move |on |- |ANSWERS✔✔c. |Issue |a |stop |
work |order |until |the |controls |can |be |corrected
You |are |inspecting |the |placement |of |a |subgrade |and |notice |that |the |undercutting |is |not |to |the |
specified |depth. |What |should |you |do?
a. |Accept |the |work |and |move |on |
b. |Notify |the |project |manager |and |request |that |the |undercutting |be |corrected |
c. |Issue |a |stop |work |order |until |the |undercutting |can |be |corrected |
d. |Document |the |issue |in |the |construction |logs |and |move |on |- |ANSWERS✔✔b. |Notify |the |
project |manager |and |request |that |the |undercutting |be |corrected
You |are |asked |to |determine |the |acceptability |of |the |results |of |a |soil |compaction |test. |What |
criteria |should |you |use |to |make |this |determination?
a. |The |compaction |meets |or |exceeds |the |specified |density |
b. |The |compaction |meets |or |exceeds |the |specified |moisture |content |
c. |The |compaction |meets |or |exceeds |both |the |specified |density |and |moisture |content |
,d. |The |compaction |meets |or |exceeds |the |specified |density |or |moisture |content |- |
ANSWERS✔✔c. |The |compaction |meets |or |exceeds |both |the |specified |density |and |moisture |
content
You |are |inspecting |the |placement |of |an |aggregate |subbase |and |notice |that |the |finish |
tolerances |are |not |being |met. |What |should |you |do?
a. |Accept |the |work |and |move |on |
b. |Notify |the |project |manager |and |request |that |the |finish |tolerances |be |corrected |
c. |Issue |a |stop |work |order |until |the |finish |tolerances |can |be |corrected |
d. |Document |the |issue |in |the |construction |logs |and |move |on |- |ANSWERS✔✔b. |Notify |the |
project |manager |and |request |that |the |finish |tolerances |be |corrected
You |are |asked |to |identify |the |limits |of |disturbance |on |a |construction |site. |What |are |the |limits |
of |disturbance?
a. |The |area |where |trees, |shrubs, |and |other |vegetation |will |be |removed |or |damaged |during |
construction |
b. |The |area |where |the |construction |activities |will |take |place |
c. |The |area |where |the |construction |activities |will |have |an |impact |on |the |environment |
d. |All |of |the |above |- |ANSWERS✔✔d. |All |of |the |above
You |are |inspecting |a |construction |site |and |notice |that |materials |testing |and |certification |are |
not |being |properly |carried |out. |What |should |you |do?
a. |Accept |the |work |and |move |on |
b. |Notify |the |project |manager |and |request |that |the |testing |and |certification |be |corrected |
c. |Issue |a |stop |work |order |until |the |testing |and |certification |can |be |corrected |
d. |Document |the |issue |in |the |construction |logs |and |move |on |- |ANSWERS✔✔b. |Notify |the |
project |manager |and |request |that |the |testing |and |certification |be |corrected
You |are |inspecting |a |construction |site |and |notice |that |the |soil |appears |to |be |a |well-graded |
mixture |of |fine |and |coarse |particles. |What |type |of |soil |is |this |likely |to |be?
, a. |Clay |
b. |Sand |
c. |Gravel |
d. |Loam |- |ANSWERS✔✔d. |Loam
You |are |asked |to |identify |the |rights-of-way |on |a |construction |site. |What |are |the |rights-of-way?
a. |The |areas |where |the |construction |activities |will |take |place |
b. |The |areas |where |the |construction |will |have |an |impact |on |the |environment |
c. |The |areas |where |utilities, |such |as |pipes |and |cables, |are |located |
d. |All |of |the |above |- |ANSWERS✔✔c. |The |areas |where |utilities, |such |as |pipes |and |cables, |are |
located
You |are |asked |to |differentiate |between |an |easement |and |a |right-of-way. |How |are |they |
different?
a. |An |easement |is |an |area |where |the |construction |activities |will |take |place, |while |a |right-of-
way |is |an |area |where |utilities, |such |as |pipes |and |cables, |are |located |
b. |An |easement |is |a |right |to |use |another |person's |land |for |a |specific |purpose, |while |a |right-of-
way |is |a |legal |right |to |pass |over |another |person's |land |
c. |An |easement |is |a |legal |right |to |pass |over |another |person's |land, |while |a |right-of-way |is |a |
right |to |use |another |person's |land |for |a |specific |purpose |
d. |There |is |no |difference |between |an |easement |and |a |right-of-way |- |ANSWERS✔✔b. |An |
easement |is |a |right |to |use |another |person's |land |for |a |specific |purpose, |while |a |right-of-way |is |
a |legal |right |to |pass |over |another |person's |land
You |are |inspecting |the |placement |of |a |subgrade |and |notice |that |the |grading |is |not |to |the |
specified |slope. |What |should |you |do?
a. |Accept |the |work |and |move |on |
b. |Notify |the |project |manager |and |request |that |the |grading |be |corrected |
c. |Issue |a |stop |work |order |until |the |grading |can |be |corrected |