100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ASPHALT PAVING LEVEL 1 AND LEVEL 2 EXAM STUDY GUIDE AND PRACTICE EXAM 2024/2025 | ACCURATE REAL EXAM QUESTIONS WITH VERIFIED ANSWERS | EXPERT VERIFIED FOR A GUARANTEED PASS | LATEST UPDATE $17.99
Add to cart

Exam (elaborations)

ASPHALT PAVING LEVEL 1 AND LEVEL 2 EXAM STUDY GUIDE AND PRACTICE EXAM 2024/2025 | ACCURATE REAL EXAM QUESTIONS WITH VERIFIED ANSWERS | EXPERT VERIFIED FOR A GUARANTEED PASS | LATEST UPDATE

 29 views  1 purchase
  • Course
  • ASPHALT PAVING LEVEL 1 AND LEVEL 2
  • Institution
  • ASPHALT PAVING LEVEL 1 AND LEVEL 2

ASPHALT PAVING LEVEL 1 AND LEVEL 2 EXAM STUDY GUIDE AND PRACTICE EXAM 2024/2025 | ACCURATE REAL EXAM QUESTIONS WITH VERIFIED ANSWERS | EXPERT VERIFIED FOR A GUARANTEED PASS | LATEST UPDATE

Preview 3 out of 18  pages

  • August 31, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ASPHALT PAVING LEVEL 1 AND LEVEL 2
  • ASPHALT PAVING LEVEL 1 AND LEVEL 2
avatar-seller
docwayne5
ASPHALT PAVING LEVEL 1 AND LEVEL 2 EXAM
STUDY GUIDE AND PRACTICE EXAM
2024/2025 | ACCURATE REAL EXAM
QUESTIONS WITH VERIFIED ANSWERS |
EXPERT VERIFIED FOR A GUARANTEED PASS |
LATEST UPDATE




A full lot of super pave asphalt is what size?
1,000 tons
1,000 to 2000 tons
2000 to 4000 tons
1 days production - ✔✔ANSW✔✔..2000 to 4000 tons

Which is not typically used as an asphalt binder in fdot mix
designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA) - ✔✔ANSW✔✔..PG 62-22

Who cuts the density cores used for verification testing?
The verification technician
The contractor
The independent verification testing technician

,None of the above - ✔✔ANSW✔✔..The contractor

A full lot is composed of 5 sublots and 4 cores per lot T/F -
✔✔ANSW✔✔..False

What is the most important for consistent compaction of asphalt
mix?
The mix is hotter in temperature
The mix is colder in temperature
The mix is uniform in temperature
Temperature of the mix does not affect compaction -
✔✔ANSW✔✔..The mix is uniform in temperature

Referring to general stationing guidelines, R1 would be ____ than
R2
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C - ✔✔ANSW✔✔..Both A and C

While using the rolling straightedge, if the needle goes in the red
zone indicating an unacceptable high spot in the section, you then
- ✔✔ANSW✔✔..Mark the pavement where the needle first goes
into the red zone and place another mark where the needle
leaves the red zone and continue

For bridge approach slabs, the 15 foot manual straightedge
should be set so ____ is on the bridge deck.
1 inch
Exactly 1/2 of the straightedge
The entire straightedge
None of the above - ✔✔ANSW✔✔..1 inch

, For the first transverse joint on a project place the ___ on the new
pavement while overlapping the transverse joint by one inch.
4 foot level
15 foot manual straight edge
Rolling straightedge
All the above - ✔✔ANSW✔✔..15 foot manual straight edge

When calibrating to check the low side of the rolling straight edge:
Place shims under the outer wheels
Place the rolling straight edge on a surface that looks flat
Place a 3/16 inch shin under each outside wheel, the gauge
should read zero on both sides of the gauge
Place shims under the center wheel - ✔✔ANSW✔✔..Place a 3/16
inch shin under each outside wheel, the gauge should read zero
on both sides of the gauge

When calibrating to check the high side of the rolling straight
edge:
Place shims under the outer wheels
Place shims under the center wheel
Place the rolling straight edge on a surface that looks flat
Place a 3/16 inch shin under the center wheel. The gauge should
read zero on both sides of the gauge. - ✔✔ANSW✔✔..Place a
3/16 inch shim under the center wheel. The gauge should read
zero on both sides of the gauge.

What do you need to know when manually checking the cross
slope?
The level length
The lane width
Height from the end of the level to pavement surface
The diameter of the bubble in the level - ✔✔ANSW✔✔..Level
length and height from the end of level to pavement surface

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller docwayne5. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

56416 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99  1x  sold
  • (0)
Add to cart
Added