height of end dams on window and door flashings - Answer 25mm or 1 inch
max rise in a flight of stairs - Answer 3.7m
when is an HRV (heat recovery ventilation) required? - Answer almost always. some exceptions in mild climates may have passive vents
permit needed for tree removal ...
Owner Builder Practice Exam Questions
Answered Correctly.
height of end dams on window and door flashings - Answer 25mm or 1 inch
max rise in a flight of stairs - Answer 3.7m
when is an HRV (heat recovery ventilation) required? - Answer almost always. some exceptions in mild
climates may have passive vents
permit needed for tree removal if tree is greater than - Answer 8" or greater in diameter
Order of inspections - Answer 1: forms, basement and crawlspace
2: Plumbing, dampproofing, foundation drainage , sanitary sewer, storm sewer, sump, water service
3: plumbing, electrical, mechanical, gas
4: framing inspection
5: insulation and vapour barrier
6: rainscreen/exterior finishs, drywall
7: building envelop inspection
8: final inspection
roof trusses are placed - Answer 24" oc
floor joists are spaced out - Answer 16"
fall protection must be used when fall height is - Answer 10ft or if fall less than that could result in
injury
, guardrail is required if - Answer 4' drop
the house must be no closer than _____ from the front of the lot - Answer 25'
minimum distance on all sides of the house is - Answer 10'
when must slides of excavation be sloped - Answer if dig is over 4'
shoring must be done when the trench is - Answer greater than 4' deep
gas lines are to be installed ______ on private property - Answer 12 inches
With an overdig how much extra do you dig around the perimeter - Answer 4-6 inches
For foundation drainage you should lay down - Answer 4-6" of 3/4 gravel
Temperature of concreate must be maintained between - Answer 10-25 degrees
step footings have a maximum rise and minimum run of - Answer 2' (600mm)
crawlspaces must be _________ and _____________ - Answer heated and ventilated
windows wells must be __________ above final grade - Answer 4-6"
window well projection must be at least _________ for bedrooms - Answer 30 inches
bottom of a window well must extend _______ below the window - Answer 10-12 inches
what moisture barrier is placed under slab foundations and crawlspaces - Answer 6-15 poly
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller TestSolver9. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.49. You're not tied to anything after your purchase.