CMP 101 Final Exam Questions With Revised Answers As a construction manager for a road construction project, you would perform the following tasks: (Select all that apply) - Hire skilled workers to perform the construction work - Manage the finances to ensure the project makes profit. - Oper...

[Show more]

Preview 3 out of 23  pages

  • September 5, 2024
  • 23
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CMP 101
  • CMP 101
avatar-seller
Brightstars
©THEBRIGHTSTARS 2024



CMP 101 Final Exam Questions With
Revised Answers

As a construction manager for a road construction project, you would perform the following
tasks:
(Select all that apply)
- Hire skilled workers to perform the construction work
- Manage the finances to ensure the project makes profit.
- Operate all road building equipment

- Ensure the project is completed on time - answer✔✔- Hire skilled workers to perform the
construction work
- Manage the finances to ensure the project makes profit.
- Ensure the project is completed on time
For CMP101, what are the 2 types of construction?
- Building and Non-building construction

- Residential and Commercial construction - answer✔✔Building and Non-building construction
GC is an acronym for which one of the following?
- Generic Construction
- General Contractor
- Genoa City
- General Construction

- None of these - answer✔✔General Contractor
On a NON-RESIDENTIAL construction project, the Owner may directly hire the following
entities:
(SELECT ALL THAT APPLY)

, ©THEBRIGHTSTARS 2024


- Electrical Engineer
- Architect
- Masonry Contractor
- Prime Contractor

- Construction Manager - answer✔✔- Architect
- Construction Manager
On a residential construction project from the following construction activities, what activity
would be performed first
- Backfilling around foundation
- Installing Formwork for foundation
- Does not matter - Either one of these can be performed first.
- Pouring concrete for foundation

- Excavation for foundation - answer✔✔Excavation for foundation
Mechanical Plans are labeled in the title box as _______________ for the first mechanical plan.
- None of these
- E1
- A1
- S1

- P1 - answer✔✔None of these
Which of the following discuss the quantity of work to be performed on a proposed construction
project?
- Construction Plans/Drawings
- None of these
- Construction Specifications

- Construction Bid Form - answer✔✔Construction Plans/Drawings
Select the activities that must be completed prior to starting the sheetrock (drywall) installation
stage

, ©THEBRIGHTSTARS 2024


- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation
- Interior Trims installation

- Interior Painting - answer✔✔- Mechanical, Electrical, and Plumbing (MEP) Rough-In
- Framing
- Insulation
During the _______________________ the owner has occupied the new building, but the
contractor is still responsible to fix any issues arising due to poor construction quality
- Warranty Period
- Construction Period
- Design Period

- Procurement Period - answer✔✔Warranty Period
Which period in history gave rise to the building trades as we know them today?
- Egypt and the pyramids
- Roman empire
- Middle Ages
- Greek influence

- Puranese - answer✔✔Middle Ages
Select the project delivery method in which a company will perform work at a CERTAIN
PERCENTAGE regardless of final profit or loss that occurs on the construction project
- Design-Bid-Build
- Design-Build
- Agency Construction Management
- At-Risk Construction Management

- Integrated Project Delivery (IPD) - answer✔✔Agency Construction Management
The new C.S.I. system contains how many categories?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Brightstars. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart