AIC Exam 2 Questions & Answers 100% CORRECT 2024/2025
What types of projects establish prevailing wage rates? - ANSWERSFederally Funded Projects
Which of the following documents are submitted by the Contractor at Bid opening? - ANSWERSProposal Form, Bid Breakdown, Addendum, Bid Bond & Non-c...
What types of projects establish prevailing wage rates? - ANSWERSFederally Funded Projects
Which of the following documents are submitted by the Contractor at Bid opening? - ANSWERSProposal
Form, Bid Breakdown, Addendum, Bid Bond & Non-collusive Affidavit
Which document establishes the forms, content, and procedures for submitting the bid proposals? -
ANSWERSInstruction to Bidders
Which of the following documents is normally incorporated by reference? - ANSWERSGeneral Conditions
What is the name of the law principle for referring the Contractor to other documents that are not
contained in the package provided? - ANSWERSIncorporated by Reference
Which document establishes the labor rates on a project? - ANSWERSPrevailing Wage Rate Schedule
Which document contains a description of the alternate(s)? - ANSWERSGeneral Requiremnts
Which document specifies the existing soil conditions? - ANSWERSInformation Available to Bidders
Which document applies to the Contractor and the Subcontractors and describes the administrative,
procedural and temporary procedures on the job site? - ANSWERSGeneral Requirements
Which document specifies the temporary facilities needed on a project? - ANSWERSGeneral
Requirements
,Which document is submitted by each bidder stating that their bid was arrived at without any conferring
with other prime bidders? - ANSWERSNon-Collusive Affidavit
Which document is submitted to the Owner for bid consideration before the Contractor can receive the
bidding documents? - ANSWERSPre-qualification Forms
Which document describes the quality of work and the quality of the materials and the construction
execution procedures? - ANSWERSTechnical Specifications
Which document describes the business procedures for a specific project and they change the initial
procedures? - ANSWERSSupplementary Conditions
Which document specifies the Regulations required such as soil erosion or minorities? -
ANSWERSGeneral Requirements
Which document requests that additional information be submitted by the bidder within 48 hours of bid
opening? - ANSWERSProposal Supplements
Which document issued by the Architect illustrates what is to be built? - ANSWERSPlans
Which document makes changes, modifications and corrections prior to bid openings? -
ANSWERSAddenda
Which documents describe the duties and responsibilities of each party and the business procedures for
administering the contract? - ANSWERSGeneral Conditions
What is the term called which requires all Bidders to include in their bid a specified amount or unit price
for a particular item? - ANSWERSCash Allowance
Which of the following systems is utilized for supporting an existing structure when the new excavation
will be below the existing structures foundation while the extension to the existing foundation is being
placed? - ANSWERSUnderpinning
, What is the lifting system called which consists of two vertical towers with a cross beam on top with the
intended purpose of lifting an unusually long piece of equipment which was transported horizontally and
it is lifted into its permanent vertical position? - ANSWERSJin Pole
What is the concrete pouring method called that is used to pour concrete under water? -
ANSWERSTremie
In construction, what is the proper terminology for transporting the off-road equipment to the job site? -
ANSWERSMobilization
Assume you are lifting an item onto the roof. The Height of the exterior wall is 27 Feet above the ground
and the horizontal distance from the centerline of the rotation is 40 feet. What is the minimum length of
the boom required? - ANSWERS70 Feet
Which of the following temporary systems is utilized to support freshly placed concrete which is poured
on the ground as a slab and lifted up to its final horizontal elevation using hydraulic jacks? - ANSWERSLift
slab form system
Which piece of equipment is most efficient for compacting granular soils such as sand, gravel, and
crushed stone? - ANSWERSSmooth-Wheel Roller
What is the primary cause for a masonry wall to collapse while under construction? - ANSWERSLack of
masonry wall bracing and a change in wind conditions
Assume you are lifting an item onto the bridge deck. The Deck is 27 feet above the ground and the
horizontal distance from the centerline of the rotation is 40 feet. What is the minimum boom angle? -
ANSWERS57
What is the working range of a Clam Shell? - ANSWERS40-54 degrees
Which piece of equipment and attachment would be the most efficient method to excavate inside a
cofferdam? - ANSWERSCrane with a Clamshell attachment
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Bensuda. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.49. You're not tied to anything after your purchase.