Cesswi- Canons questions and answers(already passed)
2 views 0 purchase
Course
CESSWI Reading Material
Institution
CESSWI Reading Material
The cornerstone of ethics and professional conduct for ECI are built on the following 5 principles:
Integrity, objectivity, confidentiality, competence, and professionalism
If a ECI individual becomes aware of a decision exercised or prescribed by their employer or client that is fraudulent...
CESSWI- 6 questions and
answers(already passed)
What are the different roles of an inspector? - answer -"official"
representative on site (your role to examine site for potential
pollutant releases)
-fact finder and record keeper
-enforcement case developer (notes might be used in a legal case)
-technical instructor (responsible to provide feedback on BMPs)
(don't recommend new BMPs or changed placement-- that is the
designer's job)
What skills are needed to be a good inspector? - answer -be
inquisitive
-be thorough with your inspections and precise with your
documentation
-make sure your inspections are consistent from site to site
-maintain integrity with your clients
-ability to resolve conflict
Inspecting goes past observational skills, it also includes... - answer
ability to communicate.
All discharge points associated with the site will need... - answer
protection during construction.
A good SWPPP should include: - answer -map contours
-sensitive areas
-critical areas
-site perimeter
, -entrances and exits
-phasing measures and construction schedules
-temporary stabilization
erosion and sediment control, stormwater control measures (make
sure BMPs are being maintained)
Why is bad if pollutants get on the roadway? - answer -Once on the
road, it is more difficult to prevent them from entering storm drains
or being run over by public traffic, which creates fugitive dust
issues.
Contacts that should be identified in the SWPPP: - answer
-name/contact of owner, operator, contractor, subcontractor
(address/phone numbers suggested)
-contact info in case NPDES discharge emergency
-responsible party in case of enforcement
What are post-construction stormwater management practices? -
answer Permanent stormwater practices that capture, convey,
store, and treat stormwater.
Compliance Inspection Meetings - answer -clarify objectives of
inspection including SWPPP review
-designate contact person
-review site
-discuss maintenance and operations requirements
-discuss good housekeeping requirements
-discuss pollution prevention/source control requirements
-discuss manufacturing processes to determine potential pollutant
sources
-verify maintenance schedule
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller BRAINBOOSTERS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $13.99. You're not tied to anything after your purchase.