100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED Green Associate Exam guide questions and answers $13.49   Add to cart

Exam (elaborations)

LEED Green Associate Exam guide questions and answers

 5 views  0 purchase
  • Course
  • LEED Green Associate
  • Institution
  • LEED Green Associate

LEED Green Associate Exam guide questions and answers

Preview 4 out of 37  pages

  • September 9, 2024
  • 37
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • LEED Green Associate
  • LEED Green Associate
avatar-seller
dennohz2000
LEED Green Associate Exam guide 2024-2025 questions and answers
Which categories are specific to the LEED for Neighborhood Development rating system and
not available in the other rating systems? (choose 2)



A. Sustainable Sites

B. Smart Location and Linkage

C. Innovation in Design

D. Green Infrastructure and Buildings

E. Regional Priority - ANSWER>>B & D



Is it possible for the same building to earn multiple LEED certifications?



A. Yes

B. No - ANSWER>>A



Which of the following are types of process water uses? (choose 3)



A. Cooling towers

B. Boilers

C. Washing machines

D. Cisterns

E. Toilets - ANSWER>>A, B & C



Which of the following are potential sources of nonpotable water? (choose 3)



A. Blackwater

B. Municipally supplied reclaimed water

C. Captured rainwater

,D. Wastewater from a toilet

E. Graywater - ANSWER>>B, C & E



Which of the following uses are best described and suitable for nonpotable water? (choose 2)



A. Drinking water

B. Irrigation

C. Clothes washing

D. Process water

E. Dishwashing

F. Showers - ANSWER>>B & D



Which of the following are not subject to LEED minimum energy requirements? (choose 3)



A. Office equipment

B. Elevators

C. Chillers

D. Process energy

E. Regulated energy - ANSWER>>A, B & D



When addressing refrigerants for a project and to comply with the Fundamental Refrigerant
Management prerequisite, which of the following should be considered? (choose 3)



A. Fan motors and variable-frequency drives for ventilation air handlers

B. Base building air-conditioning systems

C. Boilers for heating systems

D. Reuse of existing HVAC&R systems

E. Elimination of substances with high ozone-depleting potential from use in air-conditioning
and refrigeration systems - ANSWER>>B, D & E

,ASHRAE Standard 90.1-2007 is primarily concerned with which of the following? (choose 1)



A. Lighting design

B. Ventilation effectiveness

C. Energy consumption

D. Ozone depletion - ANSWER>>C



Which of the following are categorized as regulated energy? (choose 3)



A. Computers

B. Space heating

C. Refrigeration

D. Service hot water

E. Lighting - ANSWER>>B, D & E



Which of the following refrigerants is contained within fire suppression systems? (choose 1)



A. CFCs

B. HCFCs

C. HFCs

D. Chloroflurocarbons

E. Halons - ANSWER>>E



Which of the following are appropriate statements with regard to commissioning in the context
of green building? (choose 2)



A. The CxA should be a primary member of the design team who is directly responsible for the
project design or construction management.

, B. The CxA should be separate and independent from those individuals who are directly
responsible for project design or construction management (preferably from a separate firm).

C. The CxA is indirectly responsible for verifying the performance of building systems and
equipment prior to installation, calibration, and operations

D. The CxA is responsible for verifying the building systems and equipment after installation -
ANSWER>>B & D



Which energy demand reduction strategies are missing from the list below? (choose 2)

Establish energy design and energy goals

Use free energy

Insulate

A. Size the building appropriately

B. Use thermal storage

C. Monitor consumption

D. Use energy simulation

E. Purchase off-site renewable energy - ANSWER>>A & C



Which of the following could contribute to earning the On-site Renewable Energy credit?
(choose 3)



A. Passive solar design concept that captures winter heat from the sun

B. Photovoltaic panels that provide electricity to the building

C. A wind farm located within 500 miles from the project and operated by the local utility
company

D. A ground-source heat pump that takes heat from the ground

E. Solar hot water system

F. An on-site electric generator powered by geothermal energy

G. A solar farm adjacent to the project site providing clean power to the grid - ANSWER>>B, E &
F

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller dennohz2000. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79316 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart