100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
IICL CONTAINER INSPECTOR'S EXAM WITH 200 REAL EXAM PRACTICE QUESTIONS WITH CORRECT VERIFIED ANSWERS $24.99   Add to cart

Exam (elaborations)

IICL CONTAINER INSPECTOR'S EXAM WITH 200 REAL EXAM PRACTICE QUESTIONS WITH CORRECT VERIFIED ANSWERS

 3 views  0 purchase
  • Course
  • IICL CONTAINER INSPECTOR\'S
  • Institution
  • IICL CONTAINER INSPECTOR\'S

IICL CONTAINER INSPECTOR'S EXAM WITH 200 REAL EXAM PRACTICE QUESTIONS WITH CORRECT VERIFIED ANSWERS

Preview 4 out of 32  pages

  • September 9, 2024
  • 32
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • iicl
  • container inspectors
  • IICL CONTAINER INSPECTOR'S
  • IICL CONTAINER INSPECTOR'S
avatar-seller
muriithikelvin098
IICL CONTAINER INSPECTOR'S
EXAM 2024-2025 WITH 200 REAL
EXAM PRACTICE QUESTIONS WITH
CORRECT VERIFIED ANSWERS

In the Guide for Container Damage Measurement, IICL recommends a
standardized procedure using set "reference dimensions" to determine if panel
bows exceed ISO tolerances plus an additional IICL tolerance. The reference
dimension for an outward bow in a side panel is
A. 5 mm (3/16 in)
B. 10 mm (3/8 in)
C. 13 mm (1/2 in)
D. 18 mm (11/16 in) - ANSWER-D. 18 mm (11/16 in)


Each of the following components has a single 30 mm (1 1/4 in) dent. Which one
requires repair?
A. Corner post
B. Door panel
C. Roof bow
D. Bottom side rail - ANSWER-A. Corner post


For which of the following repairs does IICL recommend the use of pre-blasted
steel?
A. Sectioning of a tube-type top side rail 3 m (10 ft ) in length
B. Replacement of a side panel 122 x 244 cm (4 x 8 ft)
C. Inserting of a front corner post 182 cm (6 ft) in length on a high-cube container

pg. 1

,D. Full exterior container refurbishment - ANSWER-B. Replacement of a side
panel 122 x 244 cm (4 x 8 ft)


When heat is used to straighten a corner post, the damaged area should be heated
no more than
A. 550 C (1022 F)
B. 650 C (1200 F)
C. 750 C (1300 F)
D. 850 C (1560 F) - ANSWER-B. 650 C (1200 F)


Deflection Damage Criteria - ANSWER-Deflection criteria are commonly used for
damages such as dents or bows.


This is the most common type of damage inspection criteria. It is based on setting a
maximum dimensional limit on how far a component's surface can be permanently
deflected from its original position. If the deflection is greater than the limit, repair
is required.


A container ventilator consists of a plastic or steel cover approximately -
ANSWER-25 mm (1 in) in depth which is fitted over an area of the container side
panel in which holes have been drilled


The inside of the cover (ventilator) is fitted with horizontal projections called
_______________ to permit air interchange while preventing the entrance of
water. - ANSWER-baffles


Newer containers are generally equipped with___________________ rather than
_________________ ventilators. - ANSWER-plastic // steel




pg. 2

,Damaged ventilators are usually replaced with _______________ covers,
regardless of the original material. - ANSWER-plastic


Which of the following defects requires repair?
A. A loose door gasket
B. A bent J-bar that does not affect door operation
C. A dent 13mm (1/2 in) deep on the door sill
D. Four dents, each 11mm (7/16 in) deep, on contiguous outboard corrugations of
a roof panel - ANSWER-A. A loose door gasket


Of the following conditions in a dry-van container, which one would require
cleaning?
A. Raised mud foot prints in excess of what might normally remain after a sweep
out
B. Dry dust covering dried floor stains as might normally be found after a sweep
out
C. Coffee beans remaining inside the container as might occur after a sweep out
D. Polyurethane beads as might be expected to lodge in grooves between
floorboards after a sweep out - ANSWER-C. Coffee beans remaining inside the
container as might occur after a sweep out


An Equipment Interchange Receipt (EIR), based on an inspection with no damage
found, can be evidence of a container's compliance with: A. Australian Timber
Component Treatment Regulations B. Convention for Safe Containers (CSC)
regulations through the ACEP Program
C. Transport under custom's seal (TIR) regulations D. International Standards
Organization (ISO) CEDEX codes regulations - ANSWER-B. Convention for Safe
Containers (CSC) regulations through the ACEP Program




pg. 3

, The top of a replacement plastic ventilator should be centered what distance from
the top side rail? A. 50-55mm (2-2 3/16 in) B. 70-75mm (2 5/8 - 3 in)
C. 100mm (4in) D. 150mm (6 in) - ANSWER-A. 50-55mm (2-2 3/16 in)


When must a reference line extend the full length of a bottom side rail? A. When
there are two or more areas of damage on the bottom side rail B. When there is a
sharp bend in the bottom side rail
C. When there is a bowing over the entire bottom side rail D. When there is
additional damage to the bottom side rail so that the reference line cannot be
positioned over the ends of the damage - ANSWER-C. When there is a bowing
over the entire bottom side rail


Which of the following is NOT a transverse structural member of the container?
A. Front sill B. Tunnel rail
C. Rear header
D. Crossmember - ANSWER-B. Tunnel rail


A steel corner fitting is being replaced. To ensure better weld penetration, IICL
recommends that the edges of parts adjacent to the corner fitting be ground to a
minimum bevel of? A. 30 degrees B. 45 degrees
C. 55 degrees D. 60 degrees - ANSWER-B. 45 degrees


Which of the following components is sometimes placed longitudinally in the
container to support plywood flooring? A. Transverse bow B. Gusset
C. Hat section center spacer
D. Threshold plate - ANSWER-C. Hat section center spacer


Assuming owner and environmental regulations permit, which of the following
procedures is NOT recommended for repairing tarpaulins or open top containers?

pg. 4

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller muriithikelvin098. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $24.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79789 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$24.99
  • (0)
  Add to cart