100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Amtrak RWP Definitions (GUARANTEED SUCCESS)) $12.99   Add to cart

Exam (elaborations)

Amtrak RWP Definitions (GUARANTEED SUCCESS))

 3 views  0 purchase
  • Course
  • Amtrak
  • Institution
  • Amtrak

Adjacent Tracks A controlled or non-controlled track whose track center is spaced less than 25 feet from the track center of the occupied track. Control Operator The railroad employee in charge of a remotely controlled switch or derail, an interlocking, a controlled point, or a segment of ...

[Show more]

Preview 2 out of 6  pages

  • September 10, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Amtrak
  • Amtrak
avatar-seller
GUARANTEEDSUCCESS
Amtrak RWP Definitions
(GUARANTEED SUCCESS))

Adjacent Tracks - answer A controlled or non-controlled track whose
track center is spaced less than 25 feet from the track center of the
occupied track.


Control Operator - answer The railroad employee in charge of a
remotely controlled switch or derail, an interlocking, a controlled
point, or a segment of controlled track. Includes job titles such as
Train Dispatcher, Train Director, Block Operator, etc.


Controlled Track - answer Track upon which the railroad's operating
rules require that all movements of trains must be authorized by a
train dispatcher or a control operator.


Effective Securing Device - answer A vandal and tamper resistant
lock, keyed for application and removal only by the roadway
worker(s) for whom the protection is provided


Employee in Charge (EIC) - answer An employee responsible for a
work group under the overarching authority of the Roadway Worker
in Charge


Exclusive Track Occupancy - answer A method of establishing
Working Limits on Controlled Track in which movement authority is
withheld or restricted by the Train Dispatcher or Block Operator, or
one or more approaches to the Working Limits are protected by
Flagman.


Flagman - answer When used in relation with roadway worker
safety, an employee assigned to direct or restrict the movement of

, trains past a point on a track to provide on-track safety for roadway
workers, while engaged solely in performing that function.


Foul Time - answer A method of establishing working limits on
controlled track in which a roadway worker is notified by the control
operator that no train will operate within a specific segment of
controlled track until the roadway worker reports clear of the track.


Fouling a Track - answer The placement of an individual or item of
equipment in such proximity to a track that the individual or
equipment could be struck by a moving train or on-track equipment,
or in any case is within four feet of the field side of the near running
rail. Locations specifically engineered to provide protection from
moving trains or on-track equipment may encroach into the four
foot envelope and still not be considered fouling. These locations
are designated as clearing bays.


Gang Watchman/ Advanced Watchmen - answer An employee who is
qualified to provide warning to roadway workers of approaching
trains or on track equipment.


Inaccessible Track - answer a method of establishing working limits
on a non-controlled track by physically preventing the entry and
movement of trains and equipment.


Job Briefing - answer A meeting conducted prior to going to work.
During the job briefing, the work unit meets to discuss all aspects of
the work to be performed and any safety related concerns. Anyone
can conduct a job briefing.


Lone Worker - answer An individual roadway worker who is not
being afforded on-track safety by another roadway worker, who is
not a member of a roadway work group, and who is not engaged in a
common task with another roadway worker.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller GUARANTEEDSUCCESS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart