URE's 3F171 Set 2 Vol 2 With Questions And 100% ALL CORRECT ANSWERS
Terms in this set (55)
(201) Which of the following is not provided by the Concept of Operations(CONOPS)
War and Mobilization Plan(WMP) to support
operations?
(201) The War and Mobilization Plan(WMP) Specific Situations
addresses all of the following except...
(201) Which wartime priority supports the strategic 1
offense and defensive missions?
(202) Which plan is chiefly associated with a Expeditionary Site Plan (ESP)
temporary base?
(202) Which part of the base support Part 1
expeditionary site plan (ESP) identifies resources?
(202) Within the emergency management (EM) Installation Control Center (ICC)
process, who communicates to higher
headquarters (HQ) and with civilian agencies
during emergencies?
URE's 3F171 Set 2 Vol 2
1/6
, (202) Which organization serves as the office of Force Support Squadron (FSS)
primary responsibility (OPR) for emergency?
(203) When deployed, which ration type does not Meal, ready to eat (MRE)
require cooks?
(203) Which rations are not used for contingency B-Rations
or deployment?
(204) Which of the following enables timely Time-Phased force deployment data (TFPDD)
operational capability assessments to facilitate
joint force projection planning?
(204) Which time-phased force deployment data Requirements Driven
(TPFDD) is associated with a written operation
plan (OPLAN)?
(204) Each entry in the Joint Operational Planning Unit Line Number (ULN)
and Execution System(JOPES) time-phased force
deployment data (TPFDD) is controlled by the
(205) Which is not one of the nine key and Personnel Increment Number (PIN)
essential pieces of personnel deployment tasking
information?
(205) Under the lead/follow support concept, 1:50
when planning support in 3F1 functional areas,
food services must maintain a cook-to-customer
ratio under
(206) At which deployment period will three Day 15-29
unitized group rations (UGR) be served each day?
(206) The wartime flight feeding planning factor is 100 Percent of the base population
based on?
(206) A reference for beddown planning is AFI 10-403, Deployment Planning and Execution
covered in
(206) Handling of biohazard waste is coordinated Civil Engineering (CE)
with
URE's 3F171 Set 2 Vol 2
2/6
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Queenstin. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.99. You're not tied to anything after your purchase.