Where would one likely find a permanently installed machine condition monitoring system?
a) High speed machinery
1
b)Machines that degrade very quickly when they begin to degrade
c)Highly Critical, low speed, low load machine
d)All of the above
Which of the following depends on operators and maintenance technicians to work together to
maintain long term productive capability of the machine?
2
a)Run to Failure (RTF)
b) Planned Preventive Maintenance (PPM)
c) Planned Predictive Maintenance (PDM)
d)Reliability Centered Maintenance (RCM)
If a manufacturing plant is following a proactive maintenance strategy, which would be a
consideration for the lubrication process?
3
a)Lubricants are replaced on a predetermined frequency
b)Lubricants are selected and used for optimum machine performance c)Machines are modified to
maintain optimum lubricant cleanliness and temperature
d)B and C
MLA 2 - Chapter 1 --- Questions
1/6
, 9/10/24, 4:36 PM
Which of the following is not a Maintenance Strategy?
Which of the following is considered a short a) Run to Failure (RTF)
term maintenance strategy?
a) Run to Failure (RTF)
b) Preventive Maintenace (PPM)
c) Predictive Maintenance (PDM)
d) Reliability Centered Maintenance (RCM)
Which of the following depends on c) Planned Predictive Maintenance (PDM)
operators and maintenance technicians to
work together to maintain long term
productive capability of the machine?
a) Run to Failure (RTF)
b) Planned Preventive Maintenance (PPM)
c) Planned Predictive Maintenance (PDM)
d)Reliability Centered Maintenance (RCM)
Which of the following maintenance b)Predictive Maintenance (PDM)
strategies incorporates the use of
sophisticated technologies to analyze
changing machine condition?
a) Planned Preventive Maintenance (PPM)
b)Predictive Maintenance (PDM)
c) Reliability Centered Maintenance (RCM)
d) Daily Productive Maintenance (DPM)
What does MTBF mean? a)Mean time between failure
a) Mean time between failure
b) Maximum time between failure
c)Maintenance Time between Failure
d)Maximum time before failure
Predictive Maintenance c)Is based on early detection of faults and failures
a) Is based on run to failure
b) Is based on regular time based overhauls
c) Is based on early detection of faults and
failures
d) Is based on condition based overhauls
2/6
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Denyss. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.