100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Lean Six Sigma Yellow Belt Exam Questions and Answers $10.49   Add to cart

Exam (elaborations)

Lean Six Sigma Yellow Belt Exam Questions and Answers

 8 views  0 purchase
  • Course
  • Six Sigma Yellow Belt Certification
  • Institution
  • Six Sigma Yellow Belt Certification

Solutions are implemented in which stage of DMAIC? - Answer-Improve and Control What does DMAIC stand for? - Answer-Define, Measure, Analyze, Improve, Control pareto chart - Answer-categorical x vs categorical y run chart - Answer-continuous y vs time boxplot - Answer-continuous y vs ca...

[Show more]

Preview 2 out of 5  pages

  • September 11, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Six Sigma Yellow Belt Certification
  • Six Sigma Yellow Belt Certification
avatar-seller
lectknancy
Lean Six Sigma Yellow Belt Exam
Questions and Answers
Solutions are implemented in which stage of DMAIC? - Answer-Improve and Control

What does DMAIC stand for? - Answer-Define, Measure, Analyze, Improve, Control

pareto chart - Answer-categorical x vs categorical y

run chart - Answer-continuous y vs time

boxplot - Answer-continuous y vs categorical x

scatter plot - Answer-continuous y vs continuous x

what information does a dotplot provide? - Answer-the spread of the data

spaghetti diagrams - Answer-visual representation of the work unit flowing through a
process, can show waste of motion and transportation

4 steps to complete a spaghetti diagram - Answer-draw a scaled diagram, mark the
area of focus, walk the process, and document travel time and distance

fishbone diagram - Answer-identify potential causes and document them into categories

steps to make a fishbone diagram - Answer-select the effect, create the body, label the
categories, and define the potential causes in each category

manufacturing fishbone categories (traditional) - Answer-personnel, materials,
measurement, method, machine, and environment

CTQ - Answer-Critical to Quality; factors that are recognized to be critical to customer
satisfaction

What is a C&E matrix? - Answer-a tool that can be used to determine which inputs on
our are actually "most likely" suspects. Looks at the "X" (or inputs) that are discovered
to be most important.

Primary benefit of a C&E matrix? - Answer-allows for the numerical quantification of the
relationship between the inputs and outputs of a process

Steps to create a C&E matrix - Answer-list the outputs, rank the outputs, identify the
process steps and inputs, rank the contribution, and prioritize the critical items

, FMEA (Failure Mode and Effects Analysis) - Answer-detailed, quantitative method of
analyzing and documenting the failure modes of a process, dynamic, needs to be
continually updated; primary purpose is to diagnose and prevent risks

system FMEA - Answer-top level, early stage analysis

design FMEA - Answer-analyzes the systems, subsystems, parts, and components of a
product early in the design stage

process FMEA - Answer-focuses on: process flow, sequence, equipment, tooling gages,
inputs, outputs, and set points for each failure mode (most common)

potential failure mode - Answer-ways that a process could fail to meet the process
requirements or design intent

potential failure effects - Answer-the consequences of the potential failure mode on the
customer

current process controls - Answer-the existing controls and procedures that can prevent
or detect the failure mode

SEV (severity) column - Answer-an estimate of how severely the effect will impact the
customer

OCC (occurrence) column - Answer-likelihood that a cause will occur and will result in
the failure mode

DET (detection) column - Answer-likelihood that control will detect teh failure

RPN (risk priority number) - Answer-(multiply SEV, OCC, and DET) ranks the priority of
each failure effects

SPC (statistical process control) - Answer-The application of statistical techniques to
monitor and adjust an operation (used in control phase of DMAIC)

8 types of waste - Answer-(WORMPIIT) waiting, overproduction, rework, motion,
processing, inventory, intellect, and transportation

5 principles of lean - Answer-value, value stream, flow, pull, strive for perfection

TAKT time - Answer-understanding and responding to customer demand

at a 6 sigma level of quality, how many defects occur out of a million? - Answer-3.4

3 sources of variation - Answer-Internal processes (always targeted first), design, and
raw materials

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller lectknancy. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67163 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart