100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CSST Study Exam Questions and Answers $12.49   Add to cart

Exam (elaborations)

CSST Study Exam Questions and Answers

 5 views  0 purchase
  • Course
  • CSST
  • Institution
  • CSST

CSST Study Exam Questions and Answers

Preview 3 out of 18  pages

  • September 12, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CSST
  • CSST
avatar-seller
mereka
CSST Study Exam Questions and
Answers

Asbestos - Containing Material (ACM) - Answer -Any material or product containing
more than 1% Asbestos.

Amended Water - Answer -water with a surfactant in it.

Air Flow Tests should be performed when? - Answer --Before operation begins
-At least once per operating shift
-anytime there is a question regarding the integrity of the enclosure.

For Class I Jobs: Negative Pressure must be established for how long? - Answer -24
hrs a day for entire duration of project.

DOT (Department of Transportation) - Answer -49 CFR Parts 171 &172

Pink Book - Answer -Bulk Sampling

Before removing work clothing - Answer -Clean with a HEPA Vacuum

Where are respirators removed? - Answer -The Shower

Green Book - Answer -Management Plan

Formula for # of negative air machines - Answer -Volume of Area/15 mins
------------------------------
CFM of Unit

+ Backup Machine

1. Warning labels shall be attached in buildings, where?
2. What should they say? - Answer -1.Immediately adjacent to any ACBM, Suspected
ACBM or assumed ACBM in routine maintenance areas.
2. Caution: Asbestos. Hazardous. Do not disturb without proper training and equipment.

,For removing asphalt and vinyl flooring which contain ACM, or are in bldg. constructed
no later than 1980 and not tested... employees shall follow these work practices
(9) - Answer -1. No sanding flooring or its backing.
2. Use HEPA vacs, disposable dust bags & metal floor tool (no brush) to clean floors.
3. Resilient sheeting shall be removed by cutting & wet methods.
4. Scraping of adhesives shall be wet.
5. No dry sweeping.
6. No mechanical chipping without neg. pressure enclosure.
7. Remove tiles intact.
8. Wetting can be omitted if tiles are heated and removed intact.
9. Resilient flooring material & associated mastic shall be assumed to be ACM unless
testing determines otherwise.

A building owner of a building constructed before 1979, who knows the building
contains ACCM, shall provide all employees in that building with the following: - Answer
-Any Asbestos Surveys
- Specific ACCM locations
- General Procedures and handling restrictions
- Summary of bulk sampling results.
- Health Risks.

At a multi-employer worksite, an employer performing work requiring the establishment
of a regulated area shall...? - Answer -- Inform other employers on the site of the nature
of the employers work with asbestos or PACM
- Inform other employers of the existence of & requirements pertaining to regulated
areas.
- Inform other employers of measures taken to ensure their employees are not exposed
to asbestos.

Water Spray Process System Work Practices
(4) - Answer -1. System shall run for 10 mins before removal begins.
2. All removal shall take place within the water barrier.
3. System shall be operated by 3 persons, one of whom shall not perform removal, but
maintains equipment.
4. After removal ACM/PACM shall be bagged while still inside the water barrier.

Water Spray Process System Specifications
(3) - Answer -1. Piping shall be surrounded on 3 sides by rigid framing.
2. A 360 degree water spray on a separate high pressure water line.
3. The spray shall collide to form a fine aerosol, creating a liquid barrier between ACM &
workers.

AHERA initial cleaning procedures: - Answer -1. HEPA vacuum or steam clean all
carpets
2. HEPA vacuum or wet-clean all other floors and all other horizontal surfaces.
3. Dispose of all debris, filters, mop-heads, and clothing in sealed, leak-tight containers.

, Fiber (OSHA) - Answer -Particulate form of Asbestos, 5 micrometers or longer, with a
length-to-diameter ratio of at least 3 fol.

Training required for maintenance or custodial staff who may work in a bldg. with
ACBM? - Answer -2 hour awareness training, within 60 days of employment start date.

When Asbestos waste is taken to the landfill it should be...? - Answer -- In a separate
area for asbestos waste.
- Completely covered within 24hrs. with a minimum of 6" of non-asbestos material.
- Covered with an additional 30" of non asbestos material for final closure.

Training requirements for maintenance or custodial staff who might disturb ACBM? -
Answer -2 hour awareness
+ 14 hour additional training
(2 day)

Response Actions for significant damaged friable surfacing ACM or misc. ACM -
Answer -1. Immediately isolate the functional space and restrict access, unless isolation
is not necessary to protect human health and the environment.
2. Remove the material, or enclose or encapsulate if sufficient to protect human health
and the environment.

Asbestos Worker Training Requirement - Answer -4-Day Training Course. Includes 14
hrs. of hands on training.

What is an Asbestos fiber according to NIOSH method 7400? - Answer -A fiber equal to
or greater than 5 micrometers in length with an aspect ratio of 3:1 or greater.

When can periodic monitoring be terminated? - Answer -When employee exposures are
shown by statistically reliable measures to be below the PEL & EL.

Mechanical systems in a building - Answer --HVAC
-Plumbing
-Electrical

Functional Space - Answer -A room, a group of rooms, or homogenous area designated
by a person accredited to prepare management plans, design abatement projects, or
conduct response actions.

Building Inspector Training Requirements - Answer -3- Day training with 4 hrs hands on

Small Walk-in Enclosure Specs. - Answer -1. Accommodates no more than 2 person
2. Constructed of 6 mil. poly or equivalent
3. Placed under negative pressure with HEPA filtration device.
4. Smoke Test

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller mereka. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79223 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart