The Engineering Department's primary task is to maintain and operate the
engineering plant in a consistently high state of readiness in order to support
the ship's primary mission as an instrument of what? - -National Policy
-Which type of training, in the form of drills and evolutions, should be
augmented with maintenance and system training? - -Operational
-All officers and enlisted personnel assigned duty in connection with
supervision, operation, or maintenance of the engineering plant shall be
qualified for such assignment using Personnel Qualification Standards (PQS)
or what else as implemented per applicable OPNAV, BUPERS and TYCOM
instructions? - -Job Qualification Requirements (JQRs)
-Who assigns the Commanding Officer who will be responsible for the safe
and proper supervision, operation, and maintenance of the engineering
plant? - -Chief of Naval Personnel (CNP)
-What establish the Commanding Officer's authority and Responsibility? - -
U.S. Navy Regulations
-Who is designated as the Integrated Training Team (ITT) Leader and the
Damage Control Training Team (DCTT) Leader? - -The Executive Officer (XO)
-The Engineering Log shall be hand written in black ink utilizing which
forms? - -NAVSEA forms 3120/2 A-D
-Who supervises placing the ship in the material readiness condition of
closure ordered by the Commanding Officer and ensures that assigned
closure classifications are highly visible? - -Damage Control Assistant (DCA)
-For ships with assigned Electronic Maintenance Officers (EMOs), the
implementation of Electrical Safety Program may be shared between the
Electronic Maintenance Officer (EMO) and Electrical Officer (EO), but the
overall responsibility for the program resides with whom? - -The Electrical
Officer (EO)
-Which rank at a minimum should the ship's Oil and Water King be who is
normally in a machinery rating? - -Petty Officer First Class (E-6)
, -Who is the primary operator, tester and record keeper for all actions
involving F-76/F-44; main, auxiliary and waste heat boilers; and feed,
condensate, and fresh water? - -Oil and Water King
-Who assists the Engineer Officer and Damage Control Assistant (DCA) in
training of personnel and prevention of fighting of fires? - -Fire Marshal
-Who should be knowledgeable, administratively competent person who
reports to the Engineer Officer on all matters pertaining to technical
documentation and associated systems? - -The Technical Library Custodian
-When provided by the what, the Log Room Yeoman should be assigned
solely to the Engineering Department by the Executive Officer? - -Ship's
Manning Document (SMD)
-What specifies watch station manning requirements for Cold Iron, Auxiliary
Steaming and Condition IV only? - -Engineering Department Organization
and Regulations Manual (EDORM)
-What shall be used in directing or reporting operation of all propulsion plant
equipment? - -Engineering Operational Sequencing System (EOSS)
-What governs deviations from the Engineering Operational Sequencing
System? - -EOSS Users Guide (EUG)
-Instrumentation other than that permanently installed as part of the ship's
equipment shall not be used for control of the propulsion plant unless
specifically authorized by whom? - -The Commanding Officer (CO)
-Which devices, if installed, shall be used only during periods of authorized
training and removed or de-activated promptly upon conclusion of the
training period? - -Authorized Onboard Training (OBT)
-Who is responsible for the safe and proper operation of the ship's entire
engineering plant, the Engineering watchteam and for the performance of
duties prescribed in this section and by other competent authority? - -The
Engineering Officer of the Watch (EOOW)
-Who is in charge of the watch in the Engineroom/Fireroom? - -The Space
Supervisor
-Who is responsible for operating the main engine throttles following orders
received from the OOD, and as appropriate the EOOW/Engineroom (Space)
Supervior? - -Engineroom Throttleman
, -Who is responsible for operating the main engines, ship service generators
and associated auxiliaries? - -Engineroom Supervisor
-Who is responsible for the vacuum system and that part of the lube oil
system controlled from the upper level and other auxiliary machinery as
assigned? - -Engineroom Upper Levelman
-Who is responsible for those parts of the vacuum and lube oil systems
controlled from the lower level, the condensated pumps, circulating pumps,
and other auxiliary machinery assigned by the Engineroom supervisor? - -
Engineroom Lower Levelman
-Who is responsible for recording hourly reading of operating machinery and
for other duties as assigned by the Engineroom (Space) Supervisor? - -
Engineroom Messenger
-Which watch is responsible for operating ship service generators,
associated auxiliary machinery, and other duties as assigned by the Space
Supervisor/EOOW? - -Ships Service Turbine Generator (SSTG)
-Who is responsible for the proper operation of the boilers and associated
auxiliary equipment, and other duties as assigned by the EOOW? - -Fireroom
Supervisor
-Who is assigned at the boiler front and is responsible for maintaining the
required steam pressure by the proper use of burners and fuel supply when
steaming in manual? - -Fireroom Burnerman
-Who is responsible for recording the periodic readings of all operating
machinery and for other duties as assigned? - -Fireroom Messenger
-Which watch is responsible for monitoring stack conditions and relief valve
escape piping? - -Smoke Watch
-Who is assigned watch at the main ship's service switchboard or location
designated for control of the electrical distribution system? - -Electrical
Supervisor
-Who is the electrician or IC electrician assigned watch on one of the main or
emergency electrical switchboards? - -Electrical Switchboard Operator
-The Electrical Switchboard Operator shall inform the Electrical Supervisor
when abnormal conditions occur, when the electrical load reaches what
percent of full rated load of generators in operation, and anytime that
additional generators may be needed? - -75%
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Nursephil2023. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.49. You're not tied to anything after your purchase.