WGU - Project Management

Preview 2 out of 7  pages

  • September 13, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Wgu c783
  • Wgu c783
avatar-seller
Dreamer252
WGU - Project Management

Name the steps in validating a project. - answer Validate the business case, and then
identify and analyze stakeholders.

Name the 9 knowledge areas outlined in the PMBOK Guide. - answer Scope, time, cost,
quality, human resources, communications, risk, procurement and integration
management

Name the steps in validating a business case. - answer feasibility study, justification,
and alignment to the strategic plan

In which project process group is the project charter document created? - answer
Initiating

Name the project process group that begins when the project charter is approved -
answer Planning

This system assures the project doesn't deviate from the planned requirements. -
answer Change control system

Name the term that describes processes that are repeated. - answer Iterative

What type of requirement describes the elements required for a business process? -
answer Business requirements

What should come first, the project scope or the project charter? - answer the project
charter.

What is the purpose of the project charter? - answer The project charter normally
approves the project and authorizes it to begin.

What is the lowest level of the WBS? - answer The work package.

These help you determine whether the project is progressing as planned. - answer Key
performance indicators (KPI's)

What describes each of the deliverables and their components, the code of accounts
identifier, estimates, resources, and criteria for acceptance? - answer The WBS
dictionary.

, Which element of the scope statement documents the process and criteria you'll use to
determine whether deliverables are complete and satisfactory? - answerSuccess
criteria, otherwise known as acceptance criteria.

Name the purpose of the scope management plan. - answerIt documents the
procedures for preparing the project scope statement, in other words, the WBS; defines
how the deliverables will be verified; and describes the process for controlling scope
change requests.

Name the four types of project endings. - answerStarvation, integration, extinction and
addition.

This component of the scope statement documents the deliverables or items that will
not be included in the project. - answerExclusions

Before assembling the project team, what needs must the project manager assess first?
- answerSkills required by team members.

Name the two significant processes you'll perform within the human-resources planning
process. - answerOrganizational planning and staff acquisition

This process is where you'll choose team members or organizations who will work on
the project. - answerStaff acquisition.

What are the triple constraints according to CompTIA? - answerTime, cost and quality

Name the major elements of a scope document. - answerproduct description, key
deliverables, success and acceptance criteria, key performance indicators, exclusions,
assumptions, and constraints.

Performing this function on key deliverables results in the WBS. - answerDecomposition

An activity that cannot start until its predecessor has concluded is said to have what
type of logical relationship? - answerFinish-to-start

Name the estimating technique that bases estimates on past projects of similar size and
scope. - answerAnalogous estimating.

What is the first step in examining a scope deviation request? - answerIdentify the
cause.

What is the most often used logical relationship? - answerFinish-to-start

Three point estimates use which three estimates to calculate the average estimate? -
answerMost likely, pessimistic, and optimistic

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Dreamer252. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

72964 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.99
  • (0)
  Add to cart