100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Construction Management Final Review Study Guide $9.99   Add to cart

Exam (elaborations)

Construction Management Final Review Study Guide

 4 views  0 purchase
  • Course
  • Construction Management
  • Institution
  • Construction Management

Construction Management Final Review Study Guide Although third level players do not have direct links to the primary players, they still exercise a great deal of influence on a construction project. - Answer️️ -True Historically, the construction industry has been looked on as incredibly e...

[Show more]

Preview 3 out of 16  pages

  • September 14, 2024
  • 16
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Construction Management
  • Construction Management
avatar-seller
SophiaBennett
©SOPHIABENNETT
2024/2025 ACADEMIC YEAR




©SOPHIABENNETT 9/11/24 2024/2025

, ©SOPHIABENNETT 2024/2025 9:45 AM



Construction Management Final Review
Study Guide


Although third level players do not have direct links to the primary players, they still

exercise a great deal of influence on a construction project. - Answer✔️✔️-True


Historically, the construction industry has been looked on as incredibly efficient, safe

and time saving. - Answer✔️✔️-False

What is the contractor responsible for providing? - Answer✔️✔️-Labor, material,

equipment, and expertise

Subcontractors typically contract directly with the owner for special or trade specific

work - Answer✔️✔️-False

In environmental Construction a contractor will probably be collaborating with

ecologists, chemists, biologists, and other scientists - Answer✔️✔️-True

Who is the player in charge of the project from beginning to end? - Answer✔️✔️-Project

Manager

Through their use of stone and stonemasons, the Greeks pioneered the development of

Arches and Domes - Answer✔️✔️-False

Which of the following are considered third level Players? - Answer✔️✔️-Trade

Associations, Local, State and Federal Gov.




Page | 1

, ©SOPHIABENNETT 2024/2025 9:45 AM


The industrial revolution better defined the roles of various professions involved in

construction wherein contractors took on greater responsibility for technical coordination

- Answer✔️✔️-False

With what is the financial officer primarily concerned - Answer✔️✔️-the creation of the

budget

The owner on a construction project is accountable for which of the following -

Answer✔️✔️-Developing the program to outline the needs of the end users

Second level players in the construction industry exercise great influence on a project

through direct contracts with the owner, designer and contractor - Answer✔️✔️-False

The prime contractor on a construction project is the contractor that has a contract

directly with the owner - Answer✔️✔️-True

Maintaining a relationship with upper management is one of the attributes of leadership

abilities - Answer✔️✔️-Yes

Which of the following are Three Levels of skill developed in the middle ages -

Answer✔️✔️-Apprentice, Journeyman, Master

There are primarily three types of architects designers, project architects, and

specification writers - Answer✔️✔️-True

In construction a finite time frame associated with a completion date is one of the prime

characteristics of a project. - Answer✔️✔️-True

In Construction a program is a set of instruction telling the contractor how to build the

building - Answer✔️✔️-False




Page | 2

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller SophiaBennett. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83100 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart