100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NERC PREP TEST 101 Latest 2024 Actual Questions and Verified Answers (2024 / 2025) A+ Grade 100% Guarantee Verified by Experts $12.99   Add to cart

Exam (elaborations)

NERC PREP TEST 101 Latest 2024 Actual Questions and Verified Answers (2024 / 2025) A+ Grade 100% Guarantee Verified by Experts

 10 views  0 purchase
  • Course
  • NERC
  • Institution
  • NERC

NERC PREP TEST 101 Latest 2024 Actual Questions and Verified Answers (2024 / 2025) A+ Grade 100% Guarantee Verified by Experts

Preview 4 out of 117  pages

  • September 16, 2024
  • 117
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NERC
  • NERC
avatar-seller
BESTGOODIES
NERC PREP TEST 101.pdf file:///C:/Users/HP/Desktop/New%20folder/NERC%20PREP%20T




NERC PREP TEST 101 QUESTIONS & VERIFIED

ANSWERS



1. 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently

loaded at 1400 MW, which of the following events would most likely occur?


a. Generator MVAR output would increase

b. All system capacitors would trip off-line

c. Generator MVAR output would decrease

d. All automatic reactors would connect to the system

Answer a. Generator MVAR output would increase




2. 2. When system conditions are such that emergency procedures are expect- ed to be

implemented, which of the following actions should be considered first?


a. Shed firm load

b. Implement Active Load Management





1 of 117 9/13/2024, 5:06

,NERC PREP TEST 101.pdf file:///C:/Users/HP/Desktop/New%20folder/NERC%20PREP%20T




c. Return outaged equipment to service

d. Request a voltage reduction

Answer c. Return outaged equipment to service




3. 3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on it, but

due to parallel flows the actual flow is 1300 MW, what action should you take?


a. Request that a phase shifting transformer be installed

b. Reduce interchange transactions impacting the path

c. Request all parallel flow to PSEs to increase schedules

d. Reduce all commercial customer load

Answer b. Reduce interchange transactions impacting the path




4. 4. If your system is MVAR deficient, what action could be implemented to prevent

voltage collapse?


a. Raise system frequency above 60.5 Hz

b. Shed firm load in the deficient area

c. Separate from the Interconnection





2 of 117 9/13/2024, 5:06

,NERC PREP TEST 101.pdf file:///C:/Users/HP/Desktop/New%20folder/NERC%20PREP%20T




d. Lower transmission voltages

Answer b. Shed firm load in the deficient area




5. 5. Which of the following actions can a system operator take in order to maintain

stability on the system?


a. Request generators to absorb maximum MVAR

b. Place all operating limits on dynamic calculation

c. Raise system voltages as high as possible, but within their operating









3 of 117 9/13/2024, 5:06

,NERC PREP TEST 101.pdf file:///C:/Users/HP/Desktop/New%20folder/NERC%20PREP%20T




parameters

d. Reduce voltages on the transmission system

Answer c. Raise system voltages as high as possible, but within their operating parameters




6. 6. Which of the following actions should you take if an outage on a neigh- boring

system has caused a violation on your system?


a. Open all tie-lines to your neighbor

b. Ask the Reliability Coordinator for assistance

c. Shed load to mitigate the violation

d. Wait for the neighboring system to contact you

Answer b. Ask the Reliability Coordi- nator for assistance




7. 7. If a SOL or IROL violation occurs due to transfers across the system and it is

determined that parallel flows are contributing to the violation, what should the system

operator do?


a. Place all system capacitors in service

b. Reduce system load





4 of 117 9/13/2024, 5:06

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller BESTGOODIES. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80461 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart