100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
AMT-2 Exam Questions with correct Answers 100% $10.49   Add to cart

Exam (elaborations)

AMT-2 Exam Questions with correct Answers 100%

 1 view  0 purchase
  • Course
  • AMT 2
  • Institution
  • AMT 2

AMT-2 Exam Questions with correct Answers

Preview 1 out of 3  pages

  • September 16, 2024
  • 3
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • AMT 2
  • AMT 2
avatar-seller
UPPERFRONT
AMT-2 Exam Questions with correct
Answers

Safety is of the first importance in the discharge of duty. These rules provide for a safe
and efficient operation. In case of doubt, the safe course must always be followed. -
Answer -1.101

All employees working in electrified territory must attend training and successfully pass
the AMT-2 Electrical operating rules and instructions examination. - Answer -1.102

Employees who bave passed the required AMT-2 examination as Class A, B, of C.
Class A and B employees must pass the AMT-2 examination annually. Class C
employees must pass the AMT-2 examination every two years. Employees who fail this
examination or allow their qualifications to lapse, will not perform duties in Electrified
Territory. Employees qualifying in any month will carry qualifications to the last month of
the following calendar year. - Answer -1.103

Do not work on or about an electric circuit, apparatus, or equipment unless qualified and
authorized. - Answer -1.108

Personnel are prohibited from getting on top of any high equipment while under the
energized catenary system. - Answer -1.111

Personnel must not enter substations, converter stations, or electrical enclosures unless
qualified and authorized. - Answer -1.112

The Power Director must be advised of all personnel entering any substation or ET
enclosure. - Answer -1.113

Conductive material such as steel tape measure, wire, wet or non-rated rope, or linen
tape-line containing metallic reinforcement must not be used around energized wire
apparatus, equipment, or third rail. - Answer -1.114

When any rule cannot be complied with, all work must STOP. The Deputy Chief
Engineer - ET or his designated representative, must be informed of the circumstances
before proceeding with work. - Answer -1.115

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller UPPERFRONT. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78637 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart