100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CTS Exam Prep Questions and Correct Answers | Latest Update $13.49   Add to cart

Exam (elaborations)

CTS Exam Prep Questions and Correct Answers | Latest Update

 0 view  0 purchase
  • Course
  • CTS
  • Institution
  • CTS

What are the four teams that comprise the overall Project Team? -:- Owner, Design, Installation, and Management Who would belong to the Design team? -:- Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? -:- Developer, Construction M...

[Show more]

Preview 4 out of 58  pages

  • September 19, 2024
  • 58
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CTS
  • CTS
avatar-seller
Latestupdate
2024 /2025 | © copyright | This work may not be copied for profit gain Excel!




CTS Exam Prep Questions and Correct
Answers | Latest Update
What are the four teams that comprise the overall Project Team?


✓ -:- Owner, Design, Installation, and Management




Who would belong to the Design team?


✓ -:- Anyone with Consultant in their title except the moving consultant




Which groups make up the Management Team?


✓ -:- Developer, Construction Manager, and Building Management Agency




The End-User, Facility Manager and Building Committee comprise which team within the

Project Team?


✓ -:- Owner




Which group represent the generic roles that are important to the Project process?


✓ -:- Project Managers, Designers and Installers




1|P a g e | G r a d e A + | 2 0 2 0 2 5

,2024 /2025 | © copyright | This work may not be copied for profit gain Excel!



Which project characteristics must be considered in order to determine which method is

best suited for a particular project?


✓ -:- Schedule, Size, Type, Complexity, and Procurement Requirements




What is an important aspect of funding that has a direct impact on the project process and

design/installation?


✓ -:- Technical Support Funding




Whether a construction project is large or small, which milestones must be achieved in a

typical schedule?


✓ -:- Programming, Building Design, AV Bid, and Move -In




What type of project is a typical Consultant-Led Design-Bid-Build contract structure good

for?


✓ -:- Long term projects with extended project cycles




What is the risk in using an OFE/Integrator Installed contract structure?


✓ -:- System and infrastructure design and facility functionality may suffer



2|P a g e | G r a d e A + | 2 0 2 0 2 5

,2024 /2025 | © copyright | This work may not be copied for profit gain Excel!




What are some of the important project scope and size considerations in selecting an AV

provider?


✓ -:- Financial Stability, Current Workload, and Company Credentials




What type of document typically includes Project Size Requirements, Corporate Profile,

Team Personnel, and Warranty Response Time?


✓ -:- RFQ




a significant difference between the Two-Envelope Bid


Method and the Qualifications- Based Selection Method?


✓ -:- Negotiate with the highest ranking firm to finalize the contract




What is one of the disadvantages of contracting the AV integrator to the electrical


subcontractor?


✓ -:- More layers of responsibility and communication




3|P a g e | G r a d e A + | 2 0 2 0 2 5

, 2024 /2025 | © copyright | This work may not be copied for profit gain Excel!



When conducting a complete project bid process, what milestone follows the issuing of the

RFP?


✓ -:- Pre-Bid Meeting




Under what circumstances would you likely use an A305-1986 form?


✓ -:- Scoring responses to an RFQ




What is the ideal way to contract an AV integrator?


✓ -:- Directly to the Owner




The process of identifying the activities that end-users need to perform, and developing the

functional descriptions of your systems is referred to as:?


✓ -:- Needs Analysis




What is the main task of the third Step of the Program Phase of a Project?


✓ -:- Conducting program meetings




What should be included in the written Program Report?

4|P a g e | G r a d e A + | 2 0 2 0 2 5

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Latestupdate. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

72349 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart