Solutions Manual for Electrical Wiring Commercial 18th edition by phil simmons 2025

Preview 4 out of 131  pages

  • September 21, 2024
  • 131
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
book image

Book Title:

Author(s):

  • Edition:
  • ISBN:
  • Edition:
  • Electrical wiring
  • Electrical wiring
avatar-seller
TESTBANKSHUB
Solutions Manual for
Electrical Wiring Commercial
18th Edition by Phil Simmons
A+
Solution and Answer Guide
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115;
CHAPTER 1: COMMERCIAL BUILDING PLANS AND SPECIFICATIONS


TABLE OF CONTENTS

Review ..........................................................................................................................................................
1



Note to instructor: It is recommended that students be required to respond, where
appropriate, with answers that are complete sentences.



REVIEW

Refer to the National Electrical Code or the working drawings when necessary. Where
applicable, responses should be written in complete sentences.
1. What section of a commercial building’s specification contains a list of contract
documents?
Answer: A list of the contract documents is contained in General Clauses and Conditions. A
listing of the Commercial Building contract documents is presented in this chapter under the

,heading “Commercial Building Plans.” The instructor may wish to have the students check over
this listing and compare it with the plans provided.
2. The requirement for temporary light and power at the job site will be found in what
portion of a commercial building’s specification?
Answer: The Supplementary General Conditions specifies the job site requirements for
temporary light and power. In some contracts, this electrical system becomes the responsibility of
the general contractor; in other contracts, it is the electrical contractor’s responsibility to install
and maintain the temporary electrical system. The instructor may wish to refer the student to
NEC Article 590 and discuss the requirements in detail.




3. The electrician uses the Schedule of Working Drawings for what purpose?
Answer: The electrician uses the Schedule of Working Drawings to determine whether all of the
drawings are at hand. The information on “the other sheets” may be very important, especially in
coordinating with other contractors.
4. Complete the following items by indicating the letter(s) designating the correct source(s)
of information:
No. Answer Item Information

4. Sections Ceiling height Sections, Sheet A6

5. Electrical Electrical receptacle Electrical symbol schedule, Chapter symbol style
2, Figure 2–6 schedule

6. Electrical Electrical outlet Electrical layout drawings, Sheets
layout location El, E2, and E3 drawings

7. Elevations Exterior wall finishes Elevations, Sheets A4 and A5

8. Site plan Grading elevations Site plan, Sheet A4

9. Electrical Panelboard schedules Electrical layout drawings, Sheet E4 layout
drawings

,10. Architectural Room width Architectural floor plan, Sheets Al, floor plan A2,
and A3

11. Architectural Swing of door Architectural floor plan, Sheets Al, floor plan A2,
and A3

12. Sections View of interior wall Sections, Sheet A6

Match the items on the left with those on the right by writing the letter designation of
the appropriate organization from the list on the right.


13. NEC Electrical Code National Electrical Code (NEC)

14. IAEI Electrical inspectors International Association of
Electrical Inspectors (IAEI)


15. NFPA Fire codes National Fire Protection Association
(NFPA)

16. IESNA Lighting information Illuminating Engineering
Society of North America
(IESNA)

17. UL Listing service Underwriters Laboratories, Inc.
(UL)

18. NEMA Manufacturers’ National Electrical standards Manufacturers
Association
(NEMA)

19. PE Seal Professional Engineer (PE)


Match the items on the left with those on the right by writing the letter
designation of the proper level of NEC interpretation from the list on the
right.

, 20. with Allowed by the Code Shall be permitted, or Shall not special be required,
NEC permission

21. with May be done Shall be permitted, or Shall not

special be required, NEC permission

22. shall Must be done Shall, National Electrical Code

23. shall Required by the Code Shall, National Electrical Code

24. never Up to the electrician Shall be permitted, or Shall not be required, NEC
25. Find NEC 250.52(A)(5) and record the first four words.

Answer: The first four words of NEC 250.52(A)(5) are Rod and pipe electrodes.

Show required conversion calculations for problem 26 and problem 27.

26. Luminaire style F is four feet long. The length in SI units, as specified by the NEC, is

Answer: The length in SI units is 1.22 m; 4 ft × 0.3048 m/ft = 1.2192 m. As will be discussed
later, this luminaire is now called a 4 by 2 or the equivalent 1200 by 600 in metric terms. This
question assumes that the luminaire is exactly 4 ft long.

27. The gross area of the drugstore basement is 1395 square feet. The area in square

meters is Answer: The area in SI units is 129.7 sq. m; 1395 sq. ft × 0.093 sq. m/sq. ft

= 129.7 sq. m.




To answer Questions 28–31, refer to the Plans included with this book. Determine the Following
dimensions. Write the dimensions using unit names, not symbols (for example, 1 foot, not 1’),
and indicate the source of the information.

28. What is the inside clear distance of the interior stairway to the drugstore basement?

Answer: The inside clear distance of the interior stairway to the Drugstore basement is 4 ft 0 in.
(1.22 m), as scaled from Sheet A2.

29. What is the gross square footage of each floor of the building?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TESTBANKSHUB. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62890 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99
  • (0)
  Add to cart