Definition 1 of 476
What contains detailed descriptions of design, installation, or performance issues that are at
variance with the OPR?
The Expected Stakeholder Response To The Communication
A Glossary Of Terms
The Issues Log
The Stakeholder Management Strategy
Definition 2 of 476
What does the BOD document?
How each criterion in the OPR is implemented in the design.
Sample Specification Covering Contractor Responsibilities for HVAC Commissioning
Construction, acceptance, and post-acceptance
Design Intent Document
,Definition 3 of 476
1. Owner
2. End user
3. architect
4. electrical engineer
5. mechanical engineer
6. commissioning authority
7. controls contractor
8. mechanical contractor
9. electrical contractor
10. sheet metal contractor
11. TAB agency
12. General or construction manager
13. owners O&M staff
International Electricl Testing Associaiton
What are the Retro/Re-Commissioning phases?
Identify typical team member of the Cx Team.
What is periodic re-commissioning and what is the purpose?
Definition 4 of 476
An effective commissioning process depends upon a clear, concise, and comprehensive _____?
EQD
OPR
OPS
RTRP
,Definition 5 of 476
The OPR (evolves / doesn't evole) through each project phase.
Cxa
Shared
Evolves (like a dinosaur)
Cxt
Definition 6 of 476
DPC
Controls Contractor
Design Phase Commissioning
Functional Performance Testing
Commissioning Representative
Definition 7 of 476
The commissioning authority should review the design specifications to ensure inclusion of?
What occurs during the Retro/Re-Commissioning "Planning" phase?
Material describing the contractor's responsibilities related to commissioning
organizational, documentation, communications, and team-building skills
1.) Review TAB report
2.) Complete FPTing
3.) O&M training and documentation
4.) Complete Cx final report
, Definition 8 of 476
Who is responsible for Construction Phase Approve SVC Updates
CxA
Cxt
Owner
Shared
Definition 9 of 476
New construction commissioning costs _ to _% of total comprehensive HVAC construction
cost.
PORT
2 to 5%
Resolved
Before
Definition 10 of 476
responsibility of CxA during FPT
directing, witnessing, and documenting the tests
The OPR (created during the pre-design phase)
HVAC&R Technical Requirements for the Commissioning Process
a single entity (or joint venture) is responsible for both the detailed design and
construction
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller selftest. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.00. You're not tied to anything after your purchase.