100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Nccco Core Exam Outline Questions And Answers With Verified Solutions Already Passed!!! Rated A+ $11.49   Add to cart

Exam (elaborations)

Nccco Core Exam Outline Questions And Answers With Verified Solutions Already Passed!!! Rated A+

 0 view  0 purchase
  • Course
  • NCCCO Crane
  • Institution
  • NCCCO Crane

Nccco Core Exam Outline Questions And Answers With Verified Solutions Already Passed!!! Rated A+

Preview 2 out of 10  pages

  • September 26, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCCCO Crane
  • NCCCO Crane
avatar-seller
classhub
Nccco Core Exam Outline Questions
And Answers With Verified Solutions
Already Passed!!! Rated A+
Timber or steel - ANSWER✔✔These materials should be used when setting up on
soft surfaces such as soft ground, asphalt or backfilled material

Over the corner - ANSWER✔✔On crawler cranes, which boom position creates
the greatest ground pressure

Blocking - ANSWER✔✔Allows the weight of the crane and load to be distributed
over a greater surface area. Should be used under outrigger floats at all times.

3 - ANSWER✔✔Blocking should be at least how many times the surface area of
the float

Energized - ANSWER✔✔Overhead power lines must be considered to be in this
condition until electrical authorities indicate otherwise

Prohibited zone - ANSWER✔✔No part of the crane or load must ever enter this
area around an energized power line

kV - ANSWER✔✔The prohibited zone must be enlarged as this increases

20 foot - ANSWER✔✔What minimum distance does OSHA require be maintained
when voltage up to 350 kV is unknown

50 foot - ANSWER✔✔What minimum distance is required if the voltage is over
350 kV and unknown

Qualified signal person - ANSWER✔✔This person must be appointed any time the
crane is working within a boom's length of the prohibited zone

Tag lines - ANSWER✔✔The use of these should be avoided when lifting near
power lines, however if necessary should be non-conductive type

, Above power lines - ANSWER✔✔Avoid operating cranes or handling materials in
this area of power lines

Remain in the cab - ANSWER✔✔What does an operator do if the crane comes in
contact with a power line

Jump - ANSWER✔✔If it is necessary to leave the crane cab before power lines are
de-energized after contact, how does the operator exit the cab

transmission towers - ANSWER✔✔A crane can also become electrically charged
when working close to these (radio, microwave, cell)

Manufacturer - ANSWER✔✔Before traveling on site with a load, be sure that this
is allowed by the

Backward collapse - ANSWER✔✔Ensure the boom low enough when traveling
with a load to avoid the possibility of this

Toward the load - ANSWER✔✔Always travel in this direction when traveling with
a load

Boom extension, jib, or pinned section - ANSWER✔✔Most manufacturers do not
permit travel with a load when the boom is in these settings

Raised - ANSWER✔✔To prevent a lattice boom crane from tipping forward, the
boom should be in this position before traveling down an incline

Lowered - ANSWER✔✔To prevent a lattice boom crane from tipping backwards,
the boom should be in this position when traveling up an incline

Controlling entity - ANSWER✔✔Responsible for seeing that the ground conditions
are adequate to support the equipment.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller classhub. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76462 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart