100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCCCO Lattice Boom Crawler Crane Exam $10.49   Add to cart

Exam (elaborations)

NCCCO Lattice Boom Crawler Crane Exam

 0 view  0 purchase
  • Course
  • NCCCO Lattice
  • Institution
  • NCCCO Lattice

NCCCO Lattice Boom Crawler Crane Exam

Preview 1 out of 4  pages

  • September 28, 2024
  • 4
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCCCO Lattice
  • NCCCO Lattice
avatar-seller
CLOUND
NCCCO Lattice Boom Crawler Crane
Exam- Solved
A crawler crane is based on ________ stability of static load. - ANSWER-75%

A crawler crane traveling forward is defined as traveling in the direction of - ANSWER-
The idler

A pin-connected lattice boom is being dismantled. After connecting the equalizer (bridle)
to the connecting lugs on the boom, which boom connecting pins should be removed
first - ANSWER-Lower connection pins, located at the head of the equalizer

According to OSHA 1926.1431 personnel platforms lifts should not be made with wind
in excess of - ANSWER-20 MPH

After the crane has been checked out and before crane lift operations begin the crew
should: - ANSWER-Have a pre-lift meeting

Blocking can be placed under the ends of tracks to: - ANSWER-Increase the crane's
stability when operating over the front or back

Boom Assembly - ANSWER-Always install upper pins first

By order of hitch strength, which is the correct answer - ANSWER-Basket, vertical,
choker

During assembly where should you attach slings to lift boom sections - ANSWER-End
Fittings

During disassembly of a long boom, the hog lines are connected at the maximum
cantilever point and the boom is slightly lifted off the ground. Which pins are to be
removed next - ANSWER-The bottom pins ahead of the cantilever points

Extended Crawlers Will - ANSWER-Increase over side capacities

How does high wind effect cranes with a long boom - ANSWER-It introduces side load
onto the boom

How many broken wires in one strand must there be to remove a running wire rope from
service - ANSWER-3

How many random broken wires must there be to remove a running wire rope from
service - ANSWER-6

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller CLOUND. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76462 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart