100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PcM TRAINING QUESTIONS AND ANSWERS $10.99   Add to cart

Exam (elaborations)

PcM TRAINING QUESTIONS AND ANSWERS

 6 views  0 purchase
  • Course
  • PCM
  • Institution
  • PCM

PcM TRAINING QUESTIONS AND ANSWERS

Preview 2 out of 5  pages

  • October 2, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • PCM
  • PCM
avatar-seller
GEEKA
PcM TRAINING QUESTIONS AND ANSWERS
"Initial decision maker" - AIA - Answers-Owner

Which contract(s) does this show up in: The Architect has the right to represent the
Owner during construction? - Answers-The Owner-Architect agreement & The general
conditions

Advantages of corporation. - Answers-In the event of a law-suit, the shareholder's
personal assets are not at risk because a corporation is a separate legal entity.

ABI - Answers-Architecture Billings Index
Contraction: 40-45
Late contraction: 45-50
Late expansion: 50-55
Early phase recovery: 55-65

Pros - design-build - Answers-1) Risk of budget overruns for the university are lower
than with a design-bid-build method
2) The university would know the cost of the project sooner than with a design-bid-build
method
3) Design-build method may allow the project to be completed quicker
4) Design build method will allow the university to work with one team rather than the
architect and contractor separately

A101 - Answers-Standard Form of Agreement Between Owner and Contractor where
the basis of payment is a Stipulated Sum

A201 - Answers-General Conditions of the Contract for Construction

A701 - Answers-Instructions to Bidders

B101 - Answers-Standard Form of agreement Between Owner and Architect

C401 - Answers-Standard Form of Agreement Between Architect and Consultant

A305 - Answers-Contractor's Qualification Statement

G701 - Answers-Change Order

G702 - Answers-Application and Certificate for Payment

G703 - Answers-Continuation Sheet

G704 - Answers-Certificate of Substantial Completion

, Construction Documents - Answers-Traditionally, the most time consuming phase for
the Architect. 40% of the overall time spent in design.

Owner typically gives the architect... - Answers-- A survey
- A geotechnical report
- The program

Type of business found in architecture firms: - Answers-- General or limited partnership
- Sole proprietorship
- Corporation
- Limited liability company

Firm to increase productivity and job satisfaction through employee participation: -
Answers-- Create an Employee Stock Ownership Plan (ESOP)
- Establish a quality control circle
- Establish study groups for projects

Worker's compensation - Answers-covers the liability of the employer, architect, or
contractor to the employees for injury or sickness as a result of their employment.

Site visits - Answers-A201:
Architect keeps Owner informed about the progress and quality of Work completed, and
report 1) known deviations from the Contract Documents and 2) defects and
deficiencies observed int he Work.

Net Multiplier Rate - Answers-The amount billed to the client = net multiplier rate * hours
billed * hourly rate

3 parties for agency to occur - Answers-Principal, Agent, and a Third Party

Design-bid-build advantages - Answers-- Linear and simple process from inception to
completion of the project
- Coordination between client, architect, and contractor is relatively straightforward

NCARB Rules of Conduct on compensation - Answers-2.3:
An Architect shall not solicit or accept compensation from material or equipment
suppliers in connection with specifying or endorsing their products. As used herein,
"compensation" shall not mean customary and reasonable business hospitality,
entertainment, or product education.

Architect's primary duty; Protect the public's health, safety, and welfare - Answers-1.1:
In practice architecture, an architect's primary duty is to protect the public's health,
safety, and welfare. In discharging this duty, an architects shall act with reasonable care
and competence, and shall apply the knowledge and skill which is ordinarily applied by
architect of good standing, practicing in the same locality.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller GEEKA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79223 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart