BICSI TECHNICIAN EXAM QUESTIONS AND
CORRECT ANSWERS
L Rating - Answer A firestops ability to provide a smoke stop. (air leakage rate)
To prevent the damage of cable jacket, how often must you securely fasten electrical
nonmetallic tubing (ENT) - Answer 3 Feet so it does not damage the cable
What is the minimum dedicated power requirement of a telecommunications enclosure -
Answer 120 V ac/20
The clearance behind the PBB when mounted, should be no less than- - Answer 2inch
clearance behind the PBB when mounted
When installing a plywood backboard, you should use galvanized screws that are a
minimum of ______ longer than the depth of the wall covering, including the plywood -
Answer 0.5in
Application of under carpet telecommunications cable shall be limited to: - Answer The
transition point, TP, is an inter-connection point between horizontal cabling and UTC
Any one conduit segment is allowed to have a maximum of two 90-degree bends. A third
bend may be possible depending on circumstances - Answer Installation runs less than
33 feet
While installing racks and cabinets on an access floor, what must they be attached to? -
Answer To the frame
When installing cabinets on an access floor, how are the cabinets aligned? - Answer
, One edge flush with the floor tile cut line
A telecommunications enclosure TE may be utilized for what purpose? - Answer May be
used to provide a suitable option for moves, adds, and changes without compromising
infection control measures and other restrictions
What diameter threaded rod would you typically use for a heavy-duty ladder rack
installation? - Answer 5/8in
A supplemental bonding network in an ER or data center comprising a group of
conductors arranged in a grid is usually related to what? - Answer Access flooring
Which style of anchor requires that a hole be drilled in the floor where attachment is to
be made? - Answer Expansion anchors
Min seperation from electric motors and transformers? - Answer 48"
What stage of project will you determine the labeling requirements for cables? - Answer
Pre-construction Phase
What document contains the original floor plans with the actual installed outlet
locations, cables, length, and firestopping materials? - Answer Record drawings
What document does a project use to request an explanation, additional information, or
approval of material substitution? - Answer RFI
Comparing design documents with existing conditions, verification of parking access,
and determination of the work hours are examples of what you would learn during -
Answer A job start
T1 - Answer Layout of complete building per floor; serving zone boundaries, backbone
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Easton. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.99. You're not tied to anything after your purchase.