100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Xactimate Level 2 Certification Exam New Latest Version with All Questions from Actual Past Exam and 100% Correct $29.99   Add to cart

Exam (elaborations)

Xactimate Level 2 Certification Exam New Latest Version with All Questions from Actual Past Exam and 100% Correct

 6 views  0 purchase
  • Course
  • Xactimate Level 2
  • Institution
  • Xactimate Level 2

Xactimate Level 2 Certification Exam New Latest Version with All Questions from Actual Past Exam and 100% Correct

Preview 2 out of 9  pages

  • October 3, 2024
  • 9
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Xactimate Level 2
  • Xactimate Level 2
avatar-seller
chareiezekiel
Xactimate Level 2 Certification Exam New Latest
Version with All Questions from Actual Past Exam and
100% Correct


The ability to merge data already saved from your contact manager directly into an
estimate does not
exist. - False

Xactimate can be viewed in English and printed in a different language - True

Which of the following is not an option from the Project tab? - Complete a sketch within
the project

Which of the following is not a wall type option for stairs? - Missing below stairs

The loss recap automatically updates from an estimate. - true

When using the Custom staircase tool, after clicking once, the RED measurement
indicates what? - The total rise of the staircase

This tool allows you to change the direction that the sloped or peaked ceiling is running?
- Orientation

When adding a new level, how many feet will sketch add or subtract from the previous
level? - 9

In Sketch, the keyboard shortcut for resetting your visible windows is CTRL + SHIFT +
R. - True


When working on multiple estimates in the same city/state/zip, you can set up Project
Loss Defaults for that city/state/zip to save time. - True

Where in Xactimate can you go to change the default wall thickness for all future
estimates? - Control Center/Preferences

This is a shortcut used in Model Statements to pre-fill data that has already been
recorded in an estimate. - Token

Which of the following is not an option through the Contact Manager? - Users

, You can data transfer an estimate via XactAnalysis to another Xactimate user without
knowing their XactNet address. - False

The only way to update your Xactimate version is through a disc. - False

There is no way to re-organize the members of the Grouping pane in Estimate Items -
False

Which of the following are Roof Variables - SF, SQ, HIP, VAL, R, P

An alternate method of estimating for a loss can be done from the Sketch Tab. - True

Draw lines to match the following Staircase Variable to its correct definition - a. Tread
Count TCAS
b. Wall and Ceiling Area Above Staircase WCAS
c. Wall Area Below Staircase WBS
d. Floor Area Above Staircase FAS
e. Perimeter of Ceiling Below Staircase PCBS

You can add line items while viewing your sketch in 3D mode - True

When using subvariables, what room number does Xactimate assign to the main area
of the room? - 0

It is possible to add a line item for tile floor covering at the same time as adding a
reference area. - True

Which of the following columns in the Estimate Items/Quick Entry window allow you to
track who entered the line item? - User Column

If the activity of an item is changed, the unit price for the item does not change. - False

__________ are those additional activities, such as labor or material assumption, which
may be required to complete a task. - Supporting Events

To keep the ridge from shifting when modifying a single rafter length on a gable roof,
use the following tool: - Roof Locks

This view tool allows you to view the overlay of carpet and vinyl once those items are
graphically placed in the room. - Flooring Overlay

Which of the following are options for adding new grouping members in the grouping
window? - Append, Insert, Attach

You can re-sequence line numbers from the Estimate Reports window prior to printing
out a report. - True

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller chareiezekiel. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $29.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78677 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$29.99
  • (0)
  Add to cart