ECCC GE Review Exam Questions and Answers 100% Solved | Rated A+
6 views 0 purchase
Course
ECCC GE
Institution
ECCC GE
ECCC GE Review Exam Questions and
Answers 100% Solved | Rated A+
What is general engineering? - Those engineering capabilities and
activities, other than combat engineering that modify, maintain, and protect
the physical environment.
What is geospatial engineering? - Those engineering capabili...
hydrographic, literal, cultural and toponymic data accurately referenced to a
precise location on the earth's surface.
How long does it take type 1 concrete to achieve design strength? -
✔✔28 days
,What is the result of increase water to concrete ratio? - ✔✔Decrease;
Strength, durability, water tightness
Increases; workability
Construction Planning: What is the preferred source for class IV? -
✔✔Local procurement
Construction Planning: Who do you turn in DA Form 4283 in Garrison vs. in
contingency? - ✔✔Garrison: DPW
Contingency: TEC
What is the purpose of an EAB (Echelons Above Brigade)? - ✔✔Exists
to augment BCT capacity.
Force Protection: What capacity should you plan for? - ✔✔200% or 2
units during RIP
What are roads classified as? - ✔✔Combat roads and trails
Improved Roads
Base Camp: What are the classifications of bases? - ✔✔Contingency
and enduring (5+ years)
Base Camp: What are the types of bases? - ✔✔Base
Base Camp
Intermediate staging base
, FOB
What is the facility pressure standard for water? - ✔✔20-120 PSI
How much water should you store? - ✔✔Your storage requirement is
half of your total daily demand.
How much does water weight? - ✔✔1 cubic foot of water weighs 62.4
lbs/cu. ft
1" square in column of water, 12" high, weighs 0.422 lbs
Water Calcs - ✔✔Minimum water requirements for sustainment is:
5 gal/person/day 1 shower/laundry uses 17.5 gal
Daily water requirements for shower/laundry is
[(total # showers/exchange per week) x 17.5 gal] / 7 days
Personal water usage a day: 5 gal (personal) + 5 gal (shower) x # pax
When do you switch between the 3 airfield types? - ✔✔-Initial: up to 6
months (fast drop zones, close to fight)
-Temporary: 6-24 months (higher standard of construction)
-Semi-Permanant: over 24 months (rear areas, all mission aircraft)
What are the 3 methods of repairing craters? - ✔✔Debris Backfill crater
Choke ballast over Debris crater
Choke ballast repair
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller NinjaNerd. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.49. You're not tied to anything after your purchase.