100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
MASSACHUSETTS JOURNEYMAN PIPEFITTER EXAM (HEATING, COOLING) PJ-01 QUESTIONS AND ANSWERS 2024 $17.99   Add to cart

Exam (elaborations)

MASSACHUSETTS JOURNEYMAN PIPEFITTER EXAM (HEATING, COOLING) PJ-01 QUESTIONS AND ANSWERS 2024

 3 views  0 purchase
  • Course
  • MASSACHUSETTS JOURNEYMAN PIPEFITTER (HEATING,
  • Institution
  • MASSACHUSETTS JOURNEYMAN PIPEFITTER (HEATING,

MASSACHUSETTS JOURNEYMAN PIPEFITTER EXAM (HEATING, COOLING) PJ-01 QUESTIONS AND ANSWERS 2024

Preview 2 out of 14  pages

  • October 4, 2024
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • MASSACHUSETTS JOURNEYMAN PIPEFITTER (HEATING,
  • MASSACHUSETTS JOURNEYMAN PIPEFITTER (HEATING,
avatar-seller
Teacher101
MASSACHUSETTS JOURNEYMAN
PIPEFITTER EXAM (HEATING, COOLING)
PJ-01

Y-Type Globe - ANSWERS-The appropriate valve application for a boiler blow-off
valve on a high pressure boiler is ___________ ?



to an internal pipe in the boiler - ANSWERS-Which form of safety valve mounting
is not permissible in the heating boiler code?



reduces the turbulence of the water to give a more accurate reading in the gauge
glass - ANSWERS-Which of the following statements is true regarding a boiler
water column?



considered non-boiler external piping - ANSWERS-Boiler blow-down tanks are
_____________ .



no lower than the visible part of the gauge glass - ANSWERS-When piping up low
water fuel cut-off devices to a boiler, the devices must be piped to what height in
relation to the level of the gauge glass?



100 - ANSWERS-A 3/4" blow-off may be used on a high pressure boiler if the
boiler heating surface has less than ___________ square feet on heating surface.

, boiler, check valve - ANSWERS-The required boiler feed water stop valve on a high
pressure boiler is located between the _____________ and the ____________ .



recover steam and condensate - ANSWERS-The purpose of a Flash Tank is to
_____________________ .



must be protected by a loop seal - ANSWERS-The Bourdon Tube of a steam
pressure gauge _______________ .



2 - ANSWERS-If boiler drain lines are intended to be used both as drains and as
blow-off, ______________ valves are required.



any place above the lowest safe permissible water level and before the first stop
valve - ANSWERS-When installing a low water cut-off on a hot water heating
boiler, you may install it ____________________ .



an automatic non-return valve is not necessary - ANSWERS-When a high pressure
boiler plant only has one boiler which statement would be true?



Thermometer - ANSWERS-Which is mandatory to have installed on a separate
connection on a hot water heating boiler?



nozzles or flanges - ANSWERS-What cast iron item is not allowed on a high
pressure boiler?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Teacher101. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99
  • (0)
  Add to cart