What 10 code is transmitted for fire in a high rise MD? - ANSWER 10-77
What 10 code is transmitted for a fire in a high rise office building? - ANSWER 10-76
What are the criteria for a mayday? - ANSWER I O U My Life.
Imminent collapse
Occurred collapse
Unresponsive member
Missing member
Lost member
What are the criteria for an urgent transmission? - ANSWER BLIFE
Backing out (interior attack discontinued)
Loss of water
Injured member (non life threatening)
Fear of collapse
Fire in exposures
When stretching a 2nd line for a large store fire on the 1st floor of an OLT, where is it positioned? -
ANSWER When assured that it won't be needed on the 1st floor it may be advanced to the floor above
Units arrive at 2 story flat roof PD with fire on the top floor. Which member brings the 1st saw to the
roof? - ANSWER 2nd due Roof FF. Location of fire does not matter for a flat roof, the 2nd due brings saw
When utilizing Positive Pressure Ventilation (PPV) to pressurize the attack stairway at a fire operation,
what is the optimum placement of the Positive Pressure Fan (PPF)? - ANSWER 4' to 6' from attack
stairwell door on the ground floor at an angle tilt of 80 degrees (remember keep fan a hook's distance
away)