100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Concrete and Masonry Quiz 16 with Complete Solutions $10.99   Add to cart

Exam (elaborations)

Concrete and Masonry Quiz 16 with Complete Solutions

 1 view  0 purchase
  • Course
  • Masonry
  • Institution
  • Masonry

Concrete and Masonry Quiz 16 with Complete Solutions

Preview 1 out of 4  pages

  • October 5, 2024
  • 4
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Masonry
  • Masonry
avatar-seller
CLOUND
Concrete and Masonry Quiz 16 with
Complete Solutions
1/2 - ANSWER-During lifting, all points at which the slab is supported must be kept
within ____ inch of that needed to maintain the slab in a level position

2 - ANSWER-Lifting inserts that are embedded or otherwise attached to tilt-up precast
concrete members must be capable of supporting at least _____ times the maximum
intended load applied or transmitted to them

4 - ANSWER-Lifting inserts which are embedded or otherwise attached to precast
concrete members, other than the tilt-up members, shall be capable of supporting at
least ______ times the maximum intended load applied or transmieed to them

5 - ANSWER-Lifting hardware must be capable of supporting at least ____ times the
maximum intended load applied transmitted to the lifting hardware

8 - ANSWER-Masonry walls must be braced when they are taller than _____ feet

All of the above - ANSWER-If single-post shores are used one on top of another, when
which of the following additional shoring requirements must be met?

All of the above - ANSWER-The limited access zone of a masonry wall must be which
of the following?

All of the above - ANSWER-Which of the following are practices that will help prevent
struck by hazards

All of the above - ANSWER-Which of the following does OSHA require adequate
support for?

All of the above - ANSWER-Which of the following does OSHA require of formwork so
that it is capable of supporting all vertical and lateral loads applied to the formwork
without failure

Behind - ANSWER-Employees should not be _____ the jack during tensioning
operations

Both A and B - ANSWER-Concrete mixers with one cubic yard or larger loading skips
must be equipped with which of the following?

Buckets should be routed away from employees : Concrete buckets

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller CLOUND. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart