100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NERC PRACTICE QUESTION SET 5 Exam Questions with Answers. $25.49   Add to cart

Exam (elaborations)

NERC PRACTICE QUESTION SET 5 Exam Questions with Answers.

 1 view  0 purchase
  • Course
  • NERC
  • Institution
  • NERC

NERC PRACTICE QUESTION SET 5 Exam Questions with Answers.NERC PRACTICE QUESTION SET 5 Exam Questions with Answers.NERC PRACTICE QUESTION SET 5 Exam Questions with Answers.NERC PRACTICE QUESTION SET 5 Exam Questions with Answers.

Preview 2 out of 5  pages

  • October 6, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NERC
  • NERC
avatar-seller
Lectjoe
NERC PRACTICE QUESTION SET 5 Exam Questions
with Answers.
c - ANS If an RC, TOP, or BA determines during annual review of its Operating Plan for
control center backup functionality that a change is needed, the plan must be updated
and approved within how long?
A. 24 hours
b. 30 calendar days
c. 60 calendar days
d. 30 business days

c - ANS The Transmission Operator gives an Operating Instruction to the Generator
Operator to absorb MVAR. Which of the following is appropriate?
a. Refuse the Operating Instruction
b. Place AVR in manual and increase field current
c. Leave AVR in auto and lower the voltage setpoint
d. Leave AVR in auto and raise the voltage setpoint

a - ANS A generator AVR is in manual when a shunt capacitor bank in the area trips
offline. Which statement is true?
a. The generator field current remains the same
b. The generator output voltage increases
c. The MW output of the generator increases
d. The generator MVAR output changes to maintain voltage constant

d - ANS Which of the following devices is used to control real power flow?
a. Shunt capacitor
b. Shunt reactor
c. ULTC transformer
d. Phase Shifting Transformer

c - ANS A 100 MW transaction from area A to area B gets curtailed to 50 MW at half
past the hour. What was the MWh delivered from A to B for that hour?
a. 50 MWh
b. 68.5 MWh
c. 75 MWh
d. 150 MWh

a - ANS A Reliability Coordinator realizes telecommunications was lost for 45 minutes,
what action must the RC take?
a. Notify affected entities
b. Repair or replace within 2 hours
c. Implement the back-up control center
d. Report to NERC within 48 hours

, b - ANS The Reliability Coordinator gives an Operating Instruction to the Transmission
Operator to implement voltage reduction. What is the first action of the Transmission
Operator?
a. Repeat back the Operating Instruction verbatim
b. Repeat back the Operating Instruction
c. Adjust tap changers to lower transmission voltage
d. Lower voltage setpoints on Generator AVRs

d - ANS A Transmission Operator is experiencing high voltages in the early evening.
There are a couple of lightly loaded parallel lines in the area. Which of the following
actions would be most appropriate?
a. Use generators to absorb excess MVAR
b. Place a shunt capacitor in service
c. Remove any shunt reactors that are in service
d. Remove one of the parallel lines from service

b - ANS An area is experiencing high voltages. There are two lightly loaded parallel
lines in the area. The area also has two tie lines with the Interconnection. Which of the
following actions would be most appropriate?
a. Remove one of the tie lines from service
b. Remove one of the parallel lines from service
c. Increase generator AVR setpoints
d. Remove any shunt reactors that are in service

b - ANS A Balancing Area currently has a +75 ACE and its most severe single
contingency is 800 MW. A 675 MW generator at full capacity trips off-line. Which of the
following actions is required of the Balancing Authority?
a. Increase generation 675 MW
b. Increase generation 600 MW
c. Report the generation loss to NERC
d. Switch AGC to manual

b - ANS Which of the following is the first to respond to a frequency drop on the
Interconnection?
a. AGC
b. FR Characteristic
c. AVR
d. Inertia

c - ANS A Balancing Authority has more generation response to frequency than
expected. What could be the cause?
a. Generator droop settings too large
b. Too much motor load
c. Incorrect Frequency Bias Setting
d. Too much inertia

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Lectjoe. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $25.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78834 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$25.49
  • (0)
  Add to cart