100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Designated Representative OSSF Exam Study Guide with Complete Solutions $10.49   Add to cart

Exam (elaborations)

Designated Representative OSSF Exam Study Guide with Complete Solutions

 0 view  0 purchase
  • Course
  • 2024/2025
  • Institution
  • 2024/2025

Designated Representative OSSF Exam Study Guide with Complete Solutions 30 TAC Chapter 285 - Answer-This chapter establishes minimum standards for planning materials, construction, installation, alteration, repair, extension, operation, maintenance, permitting, and inspection of OSSFs. This cha...

[Show more]

Preview 3 out of 24  pages

  • October 6, 2024
  • 24
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • 2024/2025
  • 2024/2025
avatar-seller
EmillyCharlotte
EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024




Designated Representative OSSF Exam
Study Guide with Complete Solutions

30 TAC Chapter 285 - Answer✔✔-This chapter establishes minimum standards for planning materials,

construction, installation, alteration, repair, extension, operation, maintenance, permitting, and

inspection of OSSFs. This chapter also provides the procedures for the designation of local governmental

entities as authorized agents.


30 TAC Chapter 30 - Answer✔✔-The licensing of installers, designated representatives, and site

evaluators and the registration of apprentices is included in this chapter.


Title 5, Chapter 366 Texas Health and Safety Code - Answer✔✔-The Texas statute establishing OSSF

regulations and regulators.


September 1989 - Answer✔✔-The year in which statewide regulation of OSSFs began


OSSF minimum requirements - Answer✔✔-1) produce no more than 5,000 g of waste daily


2) waste must originate and be disposed of on site


3) wastewater must be disposed in soil or as vapor


1990 - Answer✔✔-The requirement for installers to be licensed went into effect


1998 - Answer✔✔-The requirement for Installer II and DR to be licensed went into effect


2002 - Answer✔✔-The requirement for SE to be licensed went into effect



Page 1/24

,EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024


2009 - Answer✔✔-The requirement for MP to be licensed went into effect


Installer II extra requirements - Answer✔✔-- one year as Installer I and 3 installations w/notarized

statements


- or two years as apprentice with six installations w/notarized statements


SE extra requirements - Answer✔✔-must have previous license of one:


Installer II


DR


PE


RS


Professional Geoscientist


MP extra requirements - Answer✔✔-Installer II, Class C Wastewater License, or documented experience

of 3 years as maintenance technician


Maintenance Technician and Apprentice note - Answer✔✔-Only license that doesn't require exam,

Apprentice does not require class either


3 years, 24 hours - Answer✔✔-OSSF licenses are issued for a term of ____ years and require ____ hours

for renewal


Daily - Answer✔✔-How often must an installer check an apprentice's work?


Ten Acre Rule - Answer✔✔-An OSSF for a single-family residence on a 10 acre lot or more with disposal

lines at least 100ft from property line are not required to apply for a permit for a new construction.

Page 2/24

, EMILLYCHARLOTTE 2024/2025 ACADEMIC YAER ©2024 EMILLYCHARLOTTE. ALL RIGHTS RESERVED
FIRST PUBLISH SEPTEMBER 2024


Permit Processing Steps - Answer✔✔-1) Site Evaluation w/ written report


2) Selection of OSSF based on Site Evaluation


3) System planned


4) Permit application and planning materials submitted


5) Application reviewed and approved or denied within 30 days


6) Authorization to Construct ATC issued and valid for 1 year


7) Construction


8) Inspection covering all parts of system. If failed, 7 days to send letter of deficiencies


9) License to Operate LTO issued


OSSF permit application should include: - Answer✔✔-- Site Evaluation


- Legal description of property


- Affidavits as required


- Maintenance contract


- Design Calculations


- Equipment/Material Specifications


- Scale drawing showing all features effecting operation of disposal system


- Criminal Penalties


- Injunction or civil suit


Page 3/24

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EmillyCharlotte. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80189 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart