100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
WGU C253 Advanced Managerial Accounting Industrial Refrigeration Ammonia exam questions and answers $13.99   Add to cart

Exam (elaborations)

WGU C253 Advanced Managerial Accounting Industrial Refrigeration Ammonia exam questions and answers

 1 view  0 purchase
  • Course
  • C253 Advanced Managerial Accounting
  • Institution
  • C253 Advanced Managerial Accounting

WGU C253 Advanced Managerial Accounting Industrial Refrigeration Ammonia exam questions and answers

Preview 3 out of 19  pages

  • October 7, 2024
  • 19
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • C253 Advanced Managerial Accounting
  • C253 Advanced Managerial Accounting
avatar-seller
BRAINBOOSTERS
WGU C253 Advanced Managerial
Accounting Industrial
Refrigeration Ammonia exam
questions and answers
2025(graded A+)

Absorption costing
A costing method that includes all manufacturing costs—direct
materials, direct labor, and both variable and fixed manufacturing
overhead—in unit product costs.
Activity
An event that causes the consumption of overhead resources in an
organization.
Previous
Play
Next
Rewind 10 seconds
Move forward 10 seconds
Unmute
0:00
/
0:15
Full screen
Brainpower
Read More
Activity base

,A measure of whatever causes the incurrence of a variable cost. For
example, the total cost of surgical gloves in a hospital will increase
as the number of surgeries increases. Therefore, the number of
surgeries is the activity base that explains the total cost of surgical
gloves.
Activity cost pool
A "bucket" in which costs are accumulated that relate to a single
activity measure in an activity-based costing system.
Activity measure
An allocation base in an activity-based costing system; ideally, a
measure of the amount of activity that drives the costs in an activity
cost pool.
Activity variance
The difference between a revenue or cost item in the flexible budget
and the same item in the static planning budget. An activity
variance is due solely to the difference between the actual level of
activity used in the flexible budget and the level of activity assumed
in the planning budget.
Activity-based costing (ABC)
A costing method based on activities that is designed to provide
managers with cost information for strategic and other decisions
that potentially affect capacity and therefore fixed as well as
variable costs.
Activity-based management (ABM)
A management approach that focuses on managing activities as a
way of eliminating waste and reducing delays and defects.
Administrative costs
All executive, organizational, and clerical costs associated with the
general management of an organization rather than with
manufacturing or selling.
Allocation base
A measure of activity such as direct labor-hours or machine-hours
that is used to assign costs to cost objects.
Avoidable cost

, A cost that can be eliminated by choosing one alternative over
another in a decision. This term is synonymous with differential cost
and relevant cost.
Batch-level activities
Activities that are performed each time a batch of goods is handled
or processed, regardless of how many units are in the batch. The
amount of resource consumed depends on the number of batches
run rather than on the number of units in the batch.
Benchmarking
A systematic approach to identifying the activities with the greatest
potential for improvement.
Bill of materials
A document that shows the quantity of each type of direct material
required to make a product.
Bottleneck
A machine or some other part of a process that limits the total
output of the entire system.
Break-even point
The level of sales at which profit is zero.
Budget
A detailed plan for the future that is usually expressed in formal
quantitative terms.
Capital budgeting
The process of planning significant investments in projects that
have long-term implications such as the purchase of new equipment
or the introduction of a new product.
Cash budget
A detailed plan showing how cash resources will be acquired and
used over a specific time period.
Committed fixed costs
Investments in facilities, equipment, and basic organizational
structure that can't be significantly reduced even for short periods
of time without making fundamental changes.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller BRAINBOOSTERS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart