LEED v4 GA Practice Exam UPDATED ACTUAL Questions and CORRECT Answers
2 views 0 purchase
Course
LEED Green Associate
Institution
LEED Green Associate
LEED v4 GA Practice Exam UPDATED
ACTUAL Questions and CORRECT
Answers
All of the following are part of the USGBC's policy regarding the use of their officially
registered logo, except:
A. The logo is provided by the USGBC
B. The logo may only refer to a USGBC program or product
C. The log...
LEED v4 GA Practice Exam UPDATED
ACTUAL Questions and CORRECT
Answers
All of the following are part of the USGBC's policy regarding the use of their officially
registered logo, except:
A. The logo is provided by the USGBC
B. The logo may only refer to a USGBC program or product
C. The logo signifies endorsement by the USGBC
D. All uses of the logo must include a trademark, except when repeated logos in the same
document
E. The USGBC logo is less prominent in a document than the logo of the user - CORRECT
ANSWER- ✔✔C. The logo signifies endorsement by the USGBC
A mixed use project is proposed with one story or level of residential apartments over ground
floor retail core and shell space. Which LEED rating system should the team use to certify
the project?
A. LEED Homes: Lowrise
B. LEED BD+C: New Construction
C. LEED BD+C: Core & Shell
D. LEED Neighborhood Development - CORRECT ANSWER- ✔✔B. LEED BD+C: New
Construction
The primary project team member responsible for managing the documentation for a project
in LEED Online is known as the _________________________.
A. LEED Project Analyst
B. LEED Project Assistant
C. LEED Project Ombudsman
Which one of the following refers to a way of analyzing the environmental, social, and local
impact of a material or product?
A. Impact cycle assessment
,B. Life cycle costs
C. Life cycle assessment
D. Purchasing of ongoing consumables - CORRECT ANSWER- ✔✔C. Life cycle assessment
Which of the following is not a rapidly renewable material?
A. Wool
B. Teak
C. Bamboo
D. Cork - CORRECT ANSWER- ✔✔B. Teak
Buildings in the US account for what percent of total electricity use?
A. 55%
B. 68%
C. 72%
D. 80% - CORRECT ANSWER- ✔✔C. 72%
Post-consumer recycled content is:________________.
A. Sourced from residential and commercial waste
B. Sourced from wholesale dealers
C. Sourced from manufacturing waste or by-products
D. Sourced from secondary market distributors - CORRECT ANSWER- ✔✔A. Sourced from
residential and commercial waste
Buildings in the US account for what percent of municipal solid waste?
A. 60%
B. 55%
C. 45%
D. 30% - CORRECT ANSWER- ✔✔D. 30%
Which one of the following defines nonpotable water?
, A. Water that meets drinking water standards
B. Water that does not meet drinking water standards
C. Greywater that has been treated on site to meet drinking water standards
D. Rainwater harvesting - CORRECT ANSWER- ✔✔B. Water that does not meet drinking
water standards
Which of the following are examples of pre-consumer recycled content products? (Select 3)
A. Concrete with fly ash from coal-fired power plants
B. Metal studs made from scrapped automobiles
C. Particle board made from old shipping pallets
D. Acoustical wall panel made with by-product from a plastic bottle manufacturing plant
E. Asphalt paving with reprocessed asphalt removed from old parking lot
F. Insulation made of scrap from denim jean manufacturing - CORRECT ANSWER- ✔✔A,
D, F
A. Concrete with fly ash from coal-fired power plants
D. Acoustical wall panel made with by-product from a plastic bottle
F. Insulation made of scrap from denim jean manufacturing
All of the following are typical elements of a Construction and Demolition Waste
Management Plan, except:
A. A waste diversion goal
B. Identification of types of waste to be generated during construction
C. An estimate of the total weight or volume of each type of waste to be generated during
construction
D. Identification of local resources for recycling and salvage of materials
E. Communication plan to increase participation by jobsite personnel - CORRECT
ANSWER- ✔✔C. An estimate of the total weight or volume of each type of waste to be
generated during
construction
A developer is proposing a new office building on a former industrial site less than 1/4 mile
from downtown, but a freeway separates the site from the restaurant and shopping district. In
order to improve the community connectivity of this project, the developer could:
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller MGRADES. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.49. You're not tied to anything after your purchase.