100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CFT PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS ALL CORRECT $13.49   Add to cart

Exam (elaborations)

CFT PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS ALL CORRECT

 5 views  0 purchase
  • Course
  • CFT PROJECT MANAGEMENT
  • Institution
  • CFT PROJECT MANAGEMENT

CFT PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS ALL CORRECT Unit Test - Answer-Testing of individual software or hardware units or groups of related units Owner •Usually performed by the author of the code being tested •Unit testing is a DEV responsibility, not a QA responsibility T...

[Show more]

Preview 3 out of 17  pages

  • October 10, 2024
  • 17
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CFT PROJECT MANAGEMENT
  • CFT PROJECT MANAGEMENT
avatar-seller
victoryguide
CFT PROJECT MANAGEMENT EXAM
QUESTIONS AND ANSWERS ALL
CORRECT

Unit Test - Answer-Testing of individual software or hardware units or groups of related
units

Owner
•Usually performed by the author of the code being tested
•Unit testing is a DEV responsibility, not a QA responsibility

Types of testing
•White box testing examines internals a product through direct observation
•Black box testing tests the satisfaction of requirements via inputs and outputs
•Grey box testing is a blend of white and black box testing

Integration Test - Answer-Testing the feature integration and interfaces between units
and modules to ensure TESTS UNITS TOGETHER
•They have consistent assumptions
•They communicate correctly
•If the unit components all work correctly, problems will be in the interfaces

Owner
•Integration testing is an engineering function owned by DEV and QA


Stages in team development - Answer-forming
storming
norming
performing

fifth: reforming (when team member is added or dropped/ kicks off the start of other 4
stages all over again)

8 step flowchart for closing the project - Answer-review final acceptance and
documentation
obtain approval that project goals were met
close out contracts
identify any outstanding follow up activities
take action on remaining proj funds
review proj as a whole
document lessons learned

,archive all project documents

scope definition - Answer-present in a project plan is usually derived and refined from
prior project documents

product breakdown structure PBS - Answer-identifies physical components and sub-
components of a FINAL product

exhaustive test - Answer-test every feature at least once

, System Test - Answer-Tests completed, tested new components into pre-existing
system TESTS ALL NEW UNITS IN OLD SYSTEM
•May include Stress Testing, Load Testing, Performance Testing, etc.

Owner
•Integration testing is jointly owned by DEV and QA

System test confirms that
•All code modules work as specified in a controlled environment
•System as a whole performs adequately on the target deploy platform

Regression Test - Answer-Regression testing tests that what used to work still works
•Test cases are static and appended with each new release
•May compare what is in Production to what is in Test
•Best if automated

Owner
•Owned by QA

The amount of regression testing increases with every release of the product
•More old stuff must be tested to ensure the new stuff didn't break the old stuff
•May not be feasible to continue to increase regression testing
•Consider removing "safe" code modules (rarely used, independent code)

User Acceptance Test - Answer-User Acceptance Test (UAT) tests the final product
•Based on requirements use cases
•Demonstrates how user will work with the product as a start to finish process
•Determines that the user will receive what was requested
•Confirms that the original business problem/need has been addressed

Owner
•Entire team...especially true in an iterative world
•Developers, Product Owners, Testers, Users, QA

Tests are based on three paths for each critical use case
•Happy path
•Alternate path(s)
•Exception path(s)

Project plan is complete when.. - Answer-project definition
defined scope
identified skills
task list (WBS)
task dependencies
time estimates

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller victoryguide. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart