1.Splices in rall tracks shall have: Smooth Joints
2.Hydraulic systems should have their proper fluid level checked: Daily
3.If power fails during operations, the following shouldn't apply: Do your
best to finish moving load where it was designated to go
4.If load is undetermined who is to find out if load weight does not exceed
crane rating at radius at which the load is to be lifted: Person responsible
for lift
5.Where should climbing instructions be kept: ON Site
6.All climbing operations shall be performed under the supervision of:
Quali- fied person
7.When cranes are erected, load limiting devices shall be tested for
proper setting and operation: Before crane is placed in service
8.Hooks shall be equipped with latches unless the application makes the
1/
28
,use of the latch: Impractical
9.Size and position of signs or panels must satisfy the limitations of:
Manu- facturer
10.Fall prevention measures are needed for working at locations where
you are exposed: To a fall of 6ft or more
11.Travel distance on hand levers shall not be greater: than 14 inches
from neutral position
12.For power lines rated 175KV the minimum clearance between the lines
and any part of the crane or load is: 15ft
13.All controls shall be tested by the operator at the: start of new shift
14.Before each climbing operation all load members of the support
system shall be: Inspected
15.Chain slings are required to be: ID tagged
16.Welding on loads suspended by the crane can only be done if the
load has: Insulated slings
2/
28
, 17.How much does an average cubic yard of concrete weight: 4,000 lbs
18.Main power switch for tower crane is: At base of crane
19.Items not listed in the frequent inspection checklist are: Hydraulic
pumps and valves for excessive wear or damage
20.When is it necessary to determine that there is no practical alternative
way to perform the needed work or to gain access to the area: Personnel
Lift
21.Each series of voice signals shall contain three elements stated in
the following order: Function and Direction - Distance and speed -
Function stop
22.When lifting personnel communication shall be maintained between
three of the next four: Person(s) being lifted - Operator - Signal person
23.The condition when the tower load block or hook assembly comes
in contact with the upper: Two-blocking
3/
28
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller LECTGRADER. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $11.49. You're not tied to anything after your purchase.