A company has two options for procuring materials: make or buy. Which MRP
data view of the material master will the ERP system consider for this
decision?
Select one:
a. MRP 1
b. MRP 2
c. MRP 3
d. MRP 4
e. None of the above Right Ans - b. MRP 2
The manner in which CIRs consume PIRs is determined by the
Select one:
a. Consumption type.
b. Consumption mode.
c. Consumption strategy.
d. Planning strategy.
e. Planning type. Right Ans - b. Consumption mode.
MRP type specifies
Select one:
a. Whether the material is produced in house or is obtained externally.
b. How material quantities for planning will be calculated.
c. The production control technique used in planning.
d. The available time periods the ERP system can use for scheduling.
e. The strategy for BOM selection. Right Ans - c. The production control
technique used in planning.
Replenishment lead time is
Select one:
a. The time between placing an order and receiving the materials.
b. The amount of time the routing operations will last.
c. The length of time a working center usually operates (in hrs, in one day).
d. Another term for capacity.
e. A synonym for interoperation time. Right Ans - a. The time between
placing an order and receiving the materials.
, Requirements that are calculated based on actual and forecasted sales are
known as
Select one:
a. Planned independent requirements.
b. Customer-planned independent requirements.
c. Integrated independent requirements.
d. Forecast-independent requirements.
e. Customer-independent requirements. Right Ans - a. Planned
independent requirements.
Exploding the BOM refers to
Select one:
a. Creating the BOM hierarchy showing all the levels of the BOM.
b. Calculating and planning requirements for materials at all levels of the BOM.
c. Executing the BOM for materials at the top level of the BOM.
d. Choosing the planning strategy for the BOM.
e. Generating multiple BOMs for materials in the same material group.
Right Ans - b. Calculating and planning requirements for materials at all levels
of the BOM.
The MRP technique calculates the requirements for a material based on
Select one:
a. Historical data.
b. Current data.
c. Material type.
d. Replenishment lead time. Right Ans - (The material's dependence on
other materials)
Requirements in the material planning process specify
Select one:
a. The master data requirements.
b. How the material planning should be executed.
c. The work center capacity.
d. Requirements for the different modes of transportation.
e. How many of the materials are needed and when they are needed. Right
Ans - e. How many of the materials are needed and when they are needed.
After the SOP process has generated the production plan,
Select one:
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.99. You're not tied to anything after your purchase.