100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
IMSA WORKZONE QUESTIONS AND ANSWERS $11.99   Add to cart

Exam (elaborations)

IMSA WORKZONE QUESTIONS AND ANSWERS

 4 views  0 purchase
  • Course
  • Imsa
  • Institution
  • Imsa

IMSA WORKZONE QUESTIONS AND ANSWERS

Preview 2 out of 8  pages

  • October 12, 2024
  • 8
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Imsa
  • Imsa
avatar-seller
GEEKA
IMSA WORKZONE QUESTIONS AND ANSWERS

On the shoulder adjacent to traffic being controlled - Answers-The work zone starts at
the first advance warning sign; therefore, where should the flagger stand when directing
traffic in a TTC zone?

Three - Answers-How many orange and black TTC signs should there be in each
direction on a 2-way, 2-lane rural roadway?

500 ft. - Answers-What should the sign spacing be on a two-lane, two-way rural
highway?

350 ft - Answers-How many feet apart should the advanced warning signs be on a high
speed urban roadway?

On the left hand side of the highway - Answers-For additional emphasis on a high speed
urban roadway, signs may be posted: _________

At the beginning of the taper - Answers-one a rural two-lane road, where would you
place the flagger in respect to the beginning of the taper for a closed lane?

1) Type of work to be done
2) traffic volume
3) traffic speed
4) school bus routes - Answers-What are some factors that should be considered in
formulating a TTC plan?

Diversion - Answers-the rerouting of traffic onto a temporary bypass road is known as a:
__________

Removed by grinding - Answers-pavement markings no longer needed should be:

Routinely - Answers-a TTC zone should be checked:

Standard Statement - Answers-in the MUTCD a mandatory condition is a:

A statement of a permissive condition - Answers-in the mutcd an option is:

Temporary traffic control plan - Answers-A TTC plan is a:

Typical application drawings - Answers-A TTC plan should include:

Be trained and/or certified - Answers-The MUTCD states that individuals responsible for
the implementation of TTC measures should:

, 1) traffic safety, movement, and guidance
2) TTC zone inspection
3) TTC zone maintenance - Answers-TTC principles and procedures should include:

The distance required to safely route traffic from one lane to another - Answers-Taper
length refers to:

Speed and width of lane closed - Answers-taper length is based on:

Equal in feet to the speed limit - Answers-in a taper, the maximum distance between
channelizing devices should be:

Traffic should pass to the left - Answers-on a barricade, if the stripes start at the upper
right side and angle down to the lower left side: ________

At least 28" tall and retroreflectorized with at least two white bands and two orange
bands - Answers-at night and/or on high speed roads greater than 45 mph, cones shall
be: __________


During both day and night - Answers-work zones should be inspected:

Guidance statement - Answers-a recommended practice in the MUTCD is a _______

Option statement - Answers-a permissive condition in the MUTCD is an ________

Tort - Answers-a _____ in legal terminology is *Civil Wrong* other than a beach of
contract for which a court will provide a remedy

Legal obligation - Answers-*Liability* for a tort means the ____________ to pay
monetary damages to the person injured or damaged

1) the failure to do something that reasonable person would ordinarily do
2) the doing of something that an ordinary person would not ordinarily do
3) the failure to use ordinary care - Answers-Negligence can be defined as:

Duty - Answers-the obligation for a person to conform to a certain standard of conduct is
the definition of:

Accepted standards and guidelines - Answers-the MUTCD is an example of:

Notice - Answers-a red light is out. It is reported by the police to the traffic engineering
dept. This is an example of:

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller GEEKA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

80467 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart