100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Stormwater EPA Questions And Answers $20.49   Add to cart

Exam (elaborations)

Stormwater EPA Questions And Answers

 0 view  0 purchase
  • Course
  • Storm Water Drainage
  • Institution
  • Storm Water Drainage

Stormwater EPA Questions And Answers What pollutants usually sampled for Stormwater permits require the development of minimum control measures called what?: MS4's for stormwater permits and BMPs for industrial stormwater permits How does stormwater effect construction sites Stormwater flows ...

[Show more]

Preview 3 out of 21  pages

  • October 13, 2024
  • 21
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Storm Water Drainage
  • Storm Water Drainage
avatar-seller
UpperClass
Stormwater EPA Questions And Answers

What pollutants usually sampled for Stormwater permits require the development of

minimum control measures called what?: MS4's for stormwater permits and BMPs for industrial

stormwater permits




How does stormwater effect construction sites Stormwater flows over construction sites,

picking up pollutants that can then harm or kill fish/wildlife




NPDES Stormwater Program requires sites of what size sites to obtain authorization to discharge

stormwater? One Acre or larger




What is the focus of the NPDES Stormwater Permits? Stormwater Pollution Prevention

Plans




EPA Construction General Permit (CGP) Outlines a set of provisions that construction

operators must follow to comply with the requirements of the NPDES stormwater regulations.




In California who issues NPDES permits for discharges into federal ocean water? EPA

, Stormwater EPA Questions And Answers
In California what entity handles permits for discharges into non-federal waters? CalEPA




What are the basic requirements of a CGP 1) Read entire CGP, 2) Develop a Stormwater

Pollution Prevention Plan (SWPPP), 3) Complete and submit a Notice of Intent (NOI), 4) Install

and maintain erosion and sediment controls throughout the entire construction project, 5)

Implement pollution prevention controls, 6) Conduct inspections on the site based on established

timeframe, 7) Take Corrective action to address any issue with your stormwater controls or

discharges, 8) Keep SWPPP up to date, 9) Comply with any state, requirements, 10) Keep a copy

of permit on site, and 11) Submit a notice of termination once your site is permanently stabilized

or control of site has been transferred to another operator, 12) Retain records for at least 3 years

after NOT




Stormwater Pollution Prevention Plan aims to do what? Serve as a roadmap for how you

will control you stormwater discharges and comply with the permit




Part 1.1.5 and appendix D of the 2017 CGP Requires? You to determine the eligibility

with regard to protection of threatened and endangered species and designated critical habitat.

, Stormwater EPA Questions And Answers
Part 1.1.6 and Appendix E of the 2017 CGP Requires? You to complete the screening

process with regard to protection of historic properties before you submit an NOI for permit

coverage.




What size construction sites can apply for a waiver of NPDES permit coverage? Sites that

disturb 5 acres or less




What are the three circumstances that small construction sites can apply for permit waiver?

Rainfall erosivity factor of less than five, Approved or Established Total Maximum Daily

Loads (TMDLs) can be shown to be low enough to not require stormwater control, Or an

equivalent analysis is developed that determines that such allocations are not needed to protect

water quality.




What is the equivalent analysis based on? Existing in-stream concentration, expected

growth in pollutant concentrations from all sources and a margin of safety.




At what point do EPA CGP operators need to report noncompliance? Anytime the instance

of noncompliance might endanger public health or the environment, must be reported to the EPA

regional contact

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller UpperClass. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76747 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.49
  • (0)
  Add to cart